Approved
Outcome
11 Feb 2022
91 wks
Decision time
83 wks over the 8-week target
Conditions
not captured
40
Documents
40 linked
95
Objections
280 in support
No
Appeal
none recorded
Record from the Brent planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Construction of an artificial turf pitch, ball stop fencing with access gates, acoustic all weather timber fence, flood lighting units 2 x double floodlights on the half way masts and single floodlights at each of the 4 corner masts (mounted onto 6 steel columns) and a dry pond detention basin and earth bund in a designated area within the school grounds

Reference
20/1411
Type
Full Planning Permission
Agent / consultant
Case officer
Postcode
NW6 7BQ
Council
Received
13 May 2020
Validated
28 May 2020
Target date
11 Feb 2022
Decision date
11 Feb 2022
Decision route
Planning committee
Status
Decided
Reference
20/1411
Type
Full Planning Permission
Show all 16 rows
Agent / consultant
Case officer
Postcode
NW6 7BQ
Council
Received
13 May 2020
Validated
28 May 2020
Target date
11 Feb 2022
Decision date
11 Feb 2022
Decision route
Planning committee
Status
Decided
Documents

What was filed?

Document
Published
View
Location plan
11 Feb 2022
Light mast drawings
11 Feb 2022
Aiming drawing
11 Feb 2022
Acoustic fencing 1
11 Feb 2022
Acoustic barrier 2
11 Feb 2022
General layout
11 Feb 2022
Pitch layout
11 Feb 2022
Fencing layout
11 Feb 2022
Proposed elevations
11 Feb 2022
Existing topographical plan
11 Feb 2022
Location plan
11 Feb 2022
Light mast drawings
11 Feb 2022
Aiming drawing
11 Feb 2022
Show all 10 rows
Acoustic fencing 1
11 Feb 2022
Acoustic barrier 2
11 Feb 2022
General layout
11 Feb 2022
Pitch layout
11 Feb 2022
Fencing layout
11 Feb 2022
Proposed elevations
11 Feb 2022
Existing topographical plan
11 Feb 2022

Documents open on the Brent portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Approved on 11 Feb 2022, determined by the planning committee — 91 weeks from submission (83 over the 8-week target).

Timeline

Date
Event
13 May 2020
Application received
28 May 2020
Application validated
11 Feb 2022
Statutory target date
11 Feb 2022
Committee decision: Approved
13 May 2020
Application received
28 May 2020
Application validated
11 Feb 2022
Statutory target date
Show all 4 rows
11 Feb 2022
Committee decision: Approved

Public response

Measure
Count
Objections
95
In support
280
Total comments
382
Objections
95
In support
280
Total comments
382
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Determined at committee
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Show all 4 rows
Determined at committee
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.