Planning Atlas
Planning AtlasBrentQueens Park ward22/4030
Planning application · Brent

22/4030.

62 & 62A-D, Salusbury Road, London, NW6

Full / Other Planning at 62 & 62A-D, Salusbury Road, London, NW6, received 29 Nov 2022 — approved on 21 Apr 2023 by committee.

BrentQueens Park22/4030
ApprovedRefusedOther
At a glance · this applicationBrent profile →
Approved
Outcome
21 Apr 2023
20 wks
Decision time
12 wks over the 8-week target
Conditions
not captured
27
Documents
27 linked
25
Objections
0 in support
No
Appeal
none recorded
Record from the Brent planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Change of use of ground floor residential unit to commercial (Use Class E) with single storey rear and side extension, rear dormer windows and 3 front rooflights to convert loft into a self-contained dwelling, alteration to shop front and provision for cycle storage

Reference
22/4030
Type
Full Planning Permission
Agent / consultant
Case officer
Council
Received
29 Nov 2022
Validated
22 Dec 2022
Target date
21 Apr 2023
Decision date
21 Apr 2023
Decision route
Planning committee
Status
Decided
Reference
22/4030
Type
Full Planning Permission
Show all 15 rows
Agent / consultant
Case officer
Council
Received
29 Nov 2022
Validated
22 Dec 2022
Target date
21 Apr 2023
Decision date
21 Apr 2023
Decision route
Planning committee
Status
Decided
Documents

What was filed?

Document
Published
View
Site location plan
21 Apr 2023
Existing site plan
21 Apr 2023
Proposed section b-b
21 Apr 2023
Proposed section a-a
21 Apr 2023
Existing and front and rear elevations
21 Apr 2023
Existing section
21 Apr 2023
Existing section aa
21 Apr 2023
Existing ground and first floor plan
21 Apr 2023
Tree constraints plan
21 Apr 2023
Existing loft floor plan & roof plan
21 Apr 2023
Site location plan
21 Apr 2023
Existing site plan
21 Apr 2023
Proposed section b-b
21 Apr 2023
Show all 10 rows
Proposed section a-a
21 Apr 2023
Existing and front and rear elevations
21 Apr 2023
Existing section
21 Apr 2023
Existing section aa
21 Apr 2023
Existing ground and first floor plan
21 Apr 2023
Tree constraints plan
21 Apr 2023
Existing loft floor plan & roof plan
21 Apr 2023

Documents open on the Brent portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Approved on 21 Apr 2023, determined by the planning committee — 20 weeks from submission (12 over the 8-week target).

Timeline

Date
Event
29 Nov 2022
Application received
22 Dec 2022
Application validated
21 Apr 2023
Statutory target date
21 Apr 2023
Committee decision: Approved
29 Nov 2022
Application received
22 Dec 2022
Application validated
21 Apr 2023
Statutory target date
Show all 4 rows
21 Apr 2023
Committee decision: Approved

Public response

Measure
Count
Objections
25
In support
0
Total comments
27
Objections
25
In support
0
Total comments
27
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Determined at committee
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Show all 4 rows
Determined at committee
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.