Planning Atlas
Planning AtlasBrentCricklewood & Mapesbury ward25/2977
Planning application · Brent

25/2977.

133B Dartmouth Road, London, NW2 4EN

Full / Other Planning at 133B Dartmouth Road, London, NW2 4EN, received 21 Oct 2025 — refused on 22 Dec 2025 (delegated, Hebe Leung).

BrentCricklewood & MapesburyNW2 4EN25/2977
ApprovedRefusedOther
At a glance · this applicationBrent profile →
Refused
Outcome
22 Dec 2025
9 wks
Decision time
1 wks over the 8-week target
Conditions
not captured
13
Documents
13 linked
1
Objections
0 in support
No
Appeal
none recorded
Record from the Brent planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Removal of 2x chimney stacks and installation of rear dormer window, installation of breather membrane with roof tile replacement, refreshing white paint on exiting windows and replacement of any time-worn gutters and rainwater pipes to the second floor flat.

Reference
25/2977
Type
Full Planning Permission
Applicant
Agent / consultant
Case officer
Postcode
NW2 4EN
Council
Received
21 Oct 2025
Validated
28 Oct 2025
Target date
23 Dec 2025
Decision date
22 Dec 2025
Decision route
Delegated (officer)
Status
Decided
Reference
25/2977
Type
Full Planning Permission
Show all 16 rows
Applicant
Agent / consultant
Case officer
Postcode
NW2 4EN
Council
Received
21 Oct 2025
Validated
28 Oct 2025
Target date
23 Dec 2025
Decision date
22 Dec 2025
Decision route
Delegated (officer)
Status
Decided
Documents

What was filed?

Document
Published
View
Existing floor plans
22 Dec 2025
Proposed floor plans
22 Dec 2025
Existing & proposed roof plans
22 Dec 2025
Existing & proposed longitudinal section
22 Dec 2025
Roof detail
22 Dec 2025
Location plan
22 Dec 2025
Existing elevations
22 Dec 2025
Proposed elevations
22 Dec 2025
Final delegated report
22 Dec 2025
Final decision notice
22 Dec 2025
Existing floor plans
22 Dec 2025
Proposed floor plans
22 Dec 2025
Existing & proposed roof plans
22 Dec 2025
Show all 10 rows
Existing & proposed longitudinal section
22 Dec 2025
Roof detail
22 Dec 2025
Location plan
22 Dec 2025
Existing elevations
22 Dec 2025
Proposed elevations
22 Dec 2025
Final delegated report
22 Dec 2025
Final decision notice
22 Dec 2025

Documents open on the Brent portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Refused on 22 Dec 2025, delegated decision by Hebe Leung — 9 weeks from submission (1 over the 8-week target).

Timeline

Date
Event
21 Oct 2025
Application received
28 Oct 2025
Application validated
23 Dec 2025
Statutory target date
22 Dec 2025
Delegated decision: Refused · Hebe Leung
21 Oct 2025
Application received
28 Oct 2025
Application validated
23 Dec 2025
Statutory target date
Show all 4 rows
22 Dec 2025
Delegated decision: Refused · Hebe Leung

Public response

Measure
Count
Objections
1
In support
0
Total comments
1
Objections
1
In support
0
Total comments
1
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.