Planning Atlas
Planning AtlasEalingNorthfield ward204481FUL
Planning application · Ealing

204481FUL.

264 Northfield Avenue Ealing London W5 4UB

Full / Other Planning at 264 Northfield Avenue Ealing London W5 4UB, received 2 Nov 2020 — approved on 27 Oct 2021.

EalingNorthfieldW5 4UB204481FUL
ApprovedRefusedOther
At a glance · this applicationEaling profile →
Approved
Outcome
27 Oct 2021
51 wks
Decision time
43 wks over the 8-week target
Conditions
not captured
30
Documents
30 linked
0
Objections
0 in support
No
Appeal
none recorded
Record from the Ealing planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Change of use from Learning centre/Hostel (Mixed Use Class F1/Sui generis) to Serviced Hostel (50 rooms) (Use Class Sui Generis); a single storey part front part side wrap around extension; enclosure of external staircase; infill of undercroft and single storey side extension to form a lower ground floor; construction of a third floor to provide guest lounge and cafe; associated external alterations; cycle parking and refuse storage (amended description)

Reference
204481FUL
Type
Full Application
Applicant
Agent / consultant
Case officer
Not recorded
Postcode
W5 4UB
Council
Received
2 Nov 2020
Target date
27 Dec 2020
Decision date
27 Oct 2021
Decision route
Not recorded
Status
Granted with S106 conditions
Reference
204481FUL
Type
Full Application
Show all 15 rows
Applicant
Agent / consultant
Case officer
Not recorded
Postcode
W5 4UB
Council
Received
2 Nov 2020
Target date
27 Dec 2020
Decision date
27 Oct 2021
Decision route
Not recorded
Status
Granted with S106 conditions
Documents

What was filed?

Document
Published
View
DRAFT OFFICERS REPORT
26 Apr 2021
DRAFT DECISION NOTICE
26 Apr 2021
NEIGHBOUR SITE NOTICE
18 Mar 2021
(REVISED) PROPOSED LOWER GROUND FLOOR PLAN
16 Mar 2021
(REVISED) PROPOSED GROUND FLOOR PLAN
16 Mar 2021
(REVISED) PROPOSED FIRST FLOOR PLAN
16 Mar 2021
(REVISED) PROPOSED SECOND FLOOR PLAN
16 Mar 2021
(REVISED) PROPOSED THIRD FLOOR PLAN
16 Mar 2021
(REVISED) PROPOSED FRONT ELEVATION
16 Mar 2021
(REVISED) PROPOSED REAR ELEVATIONS
16 Mar 2021
DRAFT OFFICERS REPORT
26 Apr 2021
DRAFT DECISION NOTICE
26 Apr 2021
NEIGHBOUR SITE NOTICE
18 Mar 2021
Show all 10 rows
(REVISED) PROPOSED LOWER GROUND FLOOR PLAN
16 Mar 2021
(REVISED) PROPOSED GROUND FLOOR PLAN
16 Mar 2021
(REVISED) PROPOSED FIRST FLOOR PLAN
16 Mar 2021
(REVISED) PROPOSED SECOND FLOOR PLAN
16 Mar 2021
(REVISED) PROPOSED THIRD FLOOR PLAN
16 Mar 2021
(REVISED) PROPOSED FRONT ELEVATION
16 Mar 2021
(REVISED) PROPOSED REAR ELEVATIONS
16 Mar 2021

Documents open on the Ealing portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Approved on 27 Oct 2021 — 51 weeks from submission (43 over the 8-week target).

Timeline

Date
Event
2 Nov 2020
Application received
27 Dec 2020
Statutory target date
27 Oct 2021
Delegated decision: Approved
2 Nov 2020
Application received
27 Dec 2020
Statutory target date
27 Oct 2021
Delegated decision: Approved

Public response

Measure
Count
Objections
0
In support
0
Total comments
0
Objections
0
In support
0
Total comments
0
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer not recorded
No case officer is recorded.
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer not recorded
No case officer is recorded.
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.