Record from the Ealing planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application
What is it?
Rear and side roof extensions, with rear Juliet Balcony to first floor flat
Documents open on the Ealing portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗
Decision
What happened?
Refused on 19 Apr 2024, delegated decision by Yuran Jin — 10 weeks from submission (2 over the 8-week target).
Timeline
Date
Event
9 Feb 2024
Application received
23 Feb 2024
Application validated
19 Apr 2024
Statutory target date
19 Apr 2024
Delegated decision: Refused · Yuran Jin
9 Feb 2024
Application received
23 Feb 2024
Application validated
19 Apr 2024
Statutory target date
Show all 4 rows
19 Apr 2024
Delegated decision: Refused · Yuran Jin
Why it was refused
Reason
As stated on the decision notice
1
Schedule of Reasons / Conditions
The proposed roof extensions by reason of scale, width, height, bulk, prominence and
visual impact would be an obtrusive and illogical form of development that would fail
to appear subordinate to the original house and would cause unacceptable disruption
to the original roofscape, result in harm to the character and appearance of the local
area. As such, the development would therefore fail to comply with policies D3 and D4
of the London Plan (2021), policies 7B and 7.4 of the Ealing Development
Management DPD (2013), and Ealing Housing Design Guidance 2022.
1
Schedule of Reasons / Conditions
The proposed roof extensions by reason of scale, width, height, bulk, prominence and
visual impact would be an obtrusive and illogical form of development that would fail
to appear subordinate to the original house and would cause unacceptable disruption
to the original roofscape, result in harm to the character and appearance of the local
area. As such, the development would therefore fail to comply with policies D3 and D4
of the London Plan (2021), policies 7B and 7.4 of the Ealing Development
Management DPD (2013), and Ealing Housing Design Guidance 2022.
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.