Record from the Hackney planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application
What is it?
Widening of the existing bridge, through construction of a new brick parapet on the north side of the bridge, in order to facilitate reconfiguration of the bridge to maintain the existing footways and cycleways and westbound traffic lane, whilst introducing a contra flow bus lane in the east directi
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.