Planning application · Hackney

2021/0396.

270 - 276 Kingsland Road, Hackney, London, E8 4DG

Full / Other Planning at 270 - 276 Kingsland Road, Hackney, London, E8 4DG, received 9 Feb 2021 — approved on 25 Jul 2025 by committee.

HackneyHaggerston WardE8 4DG2021/0396
ApprovedRefusedOther
At a glance · this applicationHackney profile →
Approved
Outcome
25 Jul 2025
232 wks
Decision time
224 wks over the 8-week target
Conditions
not captured
16
Documents
16 linked
Objections
not captured
No
Appeal
none recorded
Record from the Hackney planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Erection of rear extension at third and fourth levels and erection of an additional storey at fifth floor level to facilitate the provision of nine self-contained residential units with terraces and an extension to an existing unit at third floor level; restoration of lift core; levelling of slab at

Reference
2021/0396
Type
Full Planning Permission
Applicant
Agent / consultant
Case officer
Postcode
E8 4DG
Council
Received
9 Feb 2021
Validated
25 Mar 2021
Target date
25 Jul 2025
Decision date
25 Jul 2025
Decision route
Planning committee
Status
Final Decision
Reference
2021/0396
Type
Full Planning Permission
Show all 16 rows
Applicant
Agent / consultant
Case officer
Postcode
E8 4DG
Council
Received
9 Feb 2021
Validated
25 Mar 2021
Target date
25 Jul 2025
Decision date
25 Jul 2025
Decision route
Planning committee
Status
Final Decision
Documents

What was filed?

Document
Published
View
DN-Full Planning Granted Final
25 Jul 2025
Officer Report
25 Jul 2025
PADANGLE-HOUSE-0000-FULL-DRAWING-SET-C
23 Jan 2025
P_V_-Yeild-Report
21 Jan 2025
241218-AuraFire-PH-FS-G1-REV04
23 Dec 2024
Fire Statement
8 Oct 2024
Existing and proposed drawings Set A
31 Mar 2021
SAP Report Submission for Building Regulations Compliance
17 Mar 2021
ENERGY STATEMENT
17 Mar 2021
Padangle-House-Baseline-SAP-Calculations
17 Mar 2021
DN-Full Planning Granted Final
25 Jul 2025
Officer Report
25 Jul 2025
PADANGLE-HOUSE-0000-FULL-DRAWING-SET-C
23 Jan 2025
Show all 10 rows
P_V_-Yeild-Report
21 Jan 2025
241218-AuraFire-PH-FS-G1-REV04
23 Dec 2024
Fire Statement
8 Oct 2024
Existing and proposed drawings Set A
31 Mar 2021
SAP Report Submission for Building Regulations Compliance
17 Mar 2021
ENERGY STATEMENT
17 Mar 2021
Padangle-House-Baseline-SAP-Calculations
17 Mar 2021

Documents open on the Hackney portal. View the application page ↗

Decision

What happened?

Approved on 25 Jul 2025, determined by the planning committee — 232 weeks from submission (224 over the 8-week target).

Timeline

Date
Event
9 Feb 2021
Application received
25 Mar 2021
Application validated
25 Jul 2025
Statutory target date
25 Jul 2025
Committee decision: Approved
9 Feb 2021
Application received
25 Mar 2021
Application validated
25 Jul 2025
Statutory target date
Show all 4 rows
25 Jul 2025
Committee decision: Approved

Public response

Comment counts were not captured for this application.

People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Determined at committee
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Show all 4 rows
Determined at committee
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.