2022/3054.

85C Forest Road, Hackney, London, E8 3BT

Full / Other Planning at 85C Forest Road, Hackney, London, E8 3BT, received 20 Dec 2022 — approved on 13 Apr 2023 (delegated, Jonathan Bainbridge).

HackneyDalston WardE8 3BT2022/3054
ApprovedRefusedOther
At a glance · this applicationHackney profile →
Approved
Outcome
13 Apr 2023
16 wks
Decision time
8 wks over the 8-week target
Conditions
not captured
17
Documents
17 linked
0
Objections
not captured
No
Appeal
none recorded
Record from the Hackney planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Re-configuration of ground floor layout, erection of a first-floor extension, the insertion of a new door onto Forest Road, and the demolition of the existing roof and installation of green roof to the lower flat roof

Reference
2022/3054
Type
Full Planning Permission
Agent / consultant
Postcode
Council
Received
20 Dec 2022
Validated
20 Jan 2023
Target date
14 Apr 2023
Decision date
13 Apr 2023
Decision route
Delegated (officer)
Status
Final Decision
Reference
2022/3054
Type
Full Planning Permission
Show all 17 rows
Agent / consultant
Postcode
Council
Received
20 Dec 2022
Validated
20 Jan 2023
Target date
14 Apr 2023
Decision date
13 Apr 2023
Decision route
Delegated (officer)
Status
Final Decision
Documents

What was filed?

Document
Published
View
DN-Full Planning Granted Final
13 Apr 2023
Revised proposed drawings_ A201-rev-B
21 Mar 2023
Revised proposed drawings_ A202-rev-B
21 Mar 2023
Officer Report
21 Mar 2023
E106 site plan
21 Dec 2022
Community Infrastructure Levy - Completed form
21 Dec 2022
Design and access statement
21 Dec 2022
A204 prpsd daylight - shadow chart
21 Dec 2022
A203 prpsd daylight - shadow chart
21 Dec 2022
A202 proposed sections external elevations
21 Dec 2022
DN-Full Planning Granted Final
13 Apr 2023
Revised proposed drawings_ A201-rev-B
21 Mar 2023
Revised proposed drawings_ A202-rev-B
21 Mar 2023
Show all 10 rows
Officer Report
21 Mar 2023
E106 site plan
21 Dec 2022
Community Infrastructure Levy - Completed form
21 Dec 2022
Design and access statement
21 Dec 2022
A204 prpsd daylight - shadow chart
21 Dec 2022
A203 prpsd daylight - shadow chart
21 Dec 2022
A202 proposed sections external elevations
21 Dec 2022

Documents open on the Hackney portal. View the application page ↗

Decision

What happened?

Approved on 13 Apr 2023, delegated decision by Jonathan Bainbridge — 16 weeks from submission (8 over the 8-week target).

Timeline

Date
Event
20 Dec 2022
Application received
20 Jan 2023
Application validated
14 Apr 2023
Statutory target date
13 Apr 2023
Delegated decision: Approved · Jonathan Bainbridge
20 Dec 2022
Application received
20 Jan 2023
Application validated
14 Apr 2023
Statutory target date
Show all 4 rows
13 Apr 2023
Delegated decision: Approved · Jonathan Bainbridge

Public response

Measure
Count
Objections
0
Objections
0
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.