Planning AtlasHackneyHackney Central Ward wardE8 1PB115 Graham Road, London, E8 1PB2025/0207
Planning application · Hackney

2025/0207.

115 Graham Road, London, E8 1PB

Full / Other Planning at 115 Graham Road, London, E8 1PB, received 3 Feb 2025 — approved on 28 Mar 2025 (delegated, Lasse Lottgen).

ApprovedRefusedOther
At a glance · this applicationHackney profile →
Approved
Outcome
28 Mar 2025
8 wks
Decision time
inside the 8-week target
Conditions
not captured
14
Documents
14 linked
0
Objections
not captured
No
Appeal
none recorded
Record from the Hackney planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Replacement of existing timber single glazed sash windows with double glazed timber sash windows, and replacement of existing timber front entrance door and rear door with new timber doors.

Reference
2025/0207
Type
Full Planning Permission
Agent / consultant
Case officer
Postcode
Council
Received
3 Feb 2025
Target date
31 Mar 2025
Decision date
28 Mar 2025
Decision route
Delegated (officer)
Status
Final Decision
Reference
2025/0207
Type
Full Planning Permission
Show all 16 rows
Agent / consultant
Case officer
Postcode
Council
Received
3 Feb 2025
Target date
31 Mar 2025
Decision date
28 Mar 2025
Decision route
Delegated (officer)
Status
Final Decision
Documents

What was filed?

Document
Published
View
DN-Full Planning Granted Final
28 Mar 2025
Officer Report
28 Mar 2025
glazing bars with weights drawn with integral 24 mm glazing
4 Feb 2025
Detail Drawing
4 Feb 2025
Detail Drawing
4 Feb 2025
Community Infrastructure Levy - Completed form
4 Feb 2025
Detail Drawing
4 Feb 2025
Detail Drawing
4 Feb 2025
Detail Drawing
4 Feb 2025
Elevation (Front) - Proposed
4 Feb 2025
DN-Full Planning Granted Final
28 Mar 2025
Officer Report
28 Mar 2025
glazing bars with weights drawn with integral 24 mm glazing
4 Feb 2025
Show all 10 rows
Detail Drawing
4 Feb 2025
Detail Drawing
4 Feb 2025
Community Infrastructure Levy - Completed form
4 Feb 2025
Detail Drawing
4 Feb 2025
Detail Drawing
4 Feb 2025
Detail Drawing
4 Feb 2025
Elevation (Front) - Proposed
4 Feb 2025

Documents open on the Hackney portal. View the application page ↗

Decision

What happened?

Approved on 28 Mar 2025, delegated decision by Lasse Lottgen — 8 weeks from submission.

Timeline

Date
Event
3 Feb 2025
Application received
31 Mar 2025
Statutory target date
28 Mar 2025
Delegated decision: Approved · Lasse Lottgen
3 Feb 2025
Application received
31 Mar 2025
Statutory target date
28 Mar 2025
Delegated decision: Approved · Lasse Lottgen

Public response

Measure
Count
Objections
0
Objections
0
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.