Planning Atlas
Planning AtlasIslingtonSt Mary's & St James' wardP2024/0827
Planning application · Islington

P2024/0827.

25 Upper Street, London, N1 0PQ

Full / Other Planning at 25 Upper Street, London, N1 0PQ, received 2 Apr 2024 — approved on 10 Dec 2025 (delegated, Luke Bates).

IslingtonSt Mary's & St James'N1 0PQP2024/0827
ApprovedRefusedOther
At a glance · this applicationIslington profile →
Approved
Outcome
10 Dec 2025
88 wks
Decision time
80 wks over the 8-week target
11
Conditions
attached to the decision
19
Documents
19 linked
Objections
not captured
No
Appeal
none recorded
Record from the Islington planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Part retrospective change of use of part of ground floor and upper floors (first to fourth) from retail (Class E) to residential (Class C3) comprising 1 x 4 bedroom flat and erection of a rear dormer roof extension, installation of new and replacement windows and doors, and installation of 2 roof lights to front roofslope with associated alterations. **RE-CONSULTATION** You are being re-consulted as the proposed unit mix has changed from 2 x 1 bedroom flats to 1 x 4 bedroom flat and the development description has been updated.

Reference
P2024/0827
Type
Full Planning Application
Agent / consultant
Case officer
Postcode
N1 0PQ
Council
Received
2 Apr 2024
Validated
14 Mar 2025
Target date
1 May 2025
Decision date
10 Dec 2025
Decision route
Delegated (officer)
Status
FINAL DECISION
Reference
P2024/0827
Type
Full Planning Application
Show all 16 rows
Agent / consultant
Case officer
Postcode
N1 0PQ
Council
Received
2 Apr 2024
Validated
14 Mar 2025
Target date
1 May 2025
Decision date
10 Dec 2025
Decision route
Delegated (officer)
Status
FINAL DECISION
Documents

What was filed?

Document
Published
View
Location Plan
2 Apr 2024
Application Form
2 Apr 2024
Existing Floor Plans
2 Apr 2024
Existing Roof Plan & Elevations
2 Apr 2024
Existing Section
2 Apr 2024
SUPERSEDED Proposed Floor Plans
2 Apr 2024
SUPERSEDED Proposed Roof Plan & Elevations
2 Apr 2024
SUPERSEDED Proposed Section
2 Apr 2024
SUPERSEDED Design and Access Statement
2 Apr 2024
Community Infrastructure Levy Form
2 Apr 2024
Location Plan
2 Apr 2024
Application Form
2 Apr 2024
Existing Floor Plans
2 Apr 2024
Show all 10 rows
Existing Roof Plan & Elevations
2 Apr 2024
Existing Section
2 Apr 2024
SUPERSEDED Proposed Floor Plans
2 Apr 2024
SUPERSEDED Proposed Roof Plan & Elevations
2 Apr 2024
SUPERSEDED Proposed Section
2 Apr 2024
SUPERSEDED Design and Access Statement
2 Apr 2024
Community Infrastructure Levy Form
2 Apr 2024

Documents open on the Islington portal. View the application page ↗

Decision

What happened?

Approved on 10 Dec 2025, delegated decision by Luke Bates — 88 weeks from submission (80 over the 8-week target).

Timeline

Date
Event
2 Apr 2024
Application received
14 Mar 2025
Application validated
1 May 2025
Statutory target date
10 Dec 2025
Delegated decision: Approved · Luke Bates
2 Apr 2024
Application received
14 Mar 2025
Application validated
1 May 2025
Statutory target date
Show all 4 rows
10 Dec 2025
Delegated decision: Approved · Luke Bates

Public response

Comment counts were not captured for this application.

People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.