P2024/3524/FUL.

96-98 Blackstock Road, London N4 2DR

Full / Other Planning at 96-98 Blackstock Road, London N4 2DR, received 25 Nov 2024 — approved on 7 Jul 2025 (delegated, Luke Bates).

IslingtonFinsbury ParkN4 2DRP2024/3524/FUL
ApprovedRefusedOther
At a glance · this applicationIslington profile →
Approved
Outcome
7 Jul 2025
32 wks
Decision time
24 wks over the 8-week target
13
Conditions
attached to the decision
24
Documents
24 linked
Objections
not captured
No
Appeal
none recorded
Record from the Islington planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Erection of a mansard roof extension incorporating a rear roof terrace, solar PV panels and an air source heat pump (ASHP) in connection with the provision of a 1 x 2 bed flat (Class C3) with associated alterations.

Reference
P2024/3524/FUL
Type
Full Planning Application
Applicant
Agent / consultant
Case officer
Postcode
N4 2DR
Council
Received
25 Nov 2024
Validated
9 Dec 2024
Target date
2 Feb 2025
Decision date
7 Jul 2025
Decision route
Delegated (officer)
Status
FINAL DECISION
Reference
P2024/3524/FUL
Type
Full Planning Application
Show all 16 rows
Applicant
Agent / consultant
Case officer
Postcode
N4 2DR
Council
Received
25 Nov 2024
Validated
9 Dec 2024
Target date
2 Feb 2025
Decision date
7 Jul 2025
Decision route
Delegated (officer)
Status
FINAL DECISION
Documents

What was filed?

Document
Published
View
Application Form
25 Nov 2024
Location Plan
25 Nov 2024
FVA - Schedule 1
25 Nov 2024
Internal Daylight Assessment
25 Nov 2024
SUPERSEDED Existing and Proposed Drawings
25 Nov 2024
SUPERSEDED Existing and Proposed Block Plan
25 Nov 2024
Community Infrastructure Levy Form
25 Nov 2024
SUPERSEDED Design and Access Statement
25 Nov 2024
Fire Statement
25 Nov 2024
SUPERSEDED Sustainable Design and Construction Statement
25 Nov 2024
Application Form
25 Nov 2024
Location Plan
25 Nov 2024
FVA - Schedule 1
25 Nov 2024
Show all 10 rows
Internal Daylight Assessment
25 Nov 2024
SUPERSEDED Existing and Proposed Drawings
25 Nov 2024
SUPERSEDED Existing and Proposed Block Plan
25 Nov 2024
Community Infrastructure Levy Form
25 Nov 2024
SUPERSEDED Design and Access Statement
25 Nov 2024
Fire Statement
25 Nov 2024
SUPERSEDED Sustainable Design and Construction Statement
25 Nov 2024

Documents open on the Islington portal. View the application page ↗

Decision

What happened?

Approved on 7 Jul 2025, delegated decision by Luke Bates — 32 weeks from submission (24 over the 8-week target).

Timeline

Date
Event
25 Nov 2024
Application received
9 Dec 2024
Application validated
2 Feb 2025
Statutory target date
7 Jul 2025
Delegated decision: Approved · Luke Bates
25 Nov 2024
Application received
9 Dec 2024
Application validated
2 Feb 2025
Statutory target date
Show all 4 rows
7 Jul 2025
Delegated decision: Approved · Luke Bates

Public response

Comment counts were not captured for this application.

People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.