DC/21/123794.
EARL PUMPING STATION, CHILTON GROVE, LONDON, SE8
Full / Other Planning at EARL PUMPING STATION, CHILTON GROVE, LONDON, SE8, received 6 Oct 2021 — approved on 6 Jan 2022 (delegated, Zahra Rad).
What is it?
Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 formal application under EARPS11 (Street Trees) - Installation of Piezometer in Root Protection Area
Show all 14 rows
What was filed?
No documents are recorded for this application.
Documents open on the Lewisham portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗
What happened?
Approved on 6 Jan 2022, delegated decision by Zahra Rad — 13 weeks from submission (5 over the 8-week target).
Timeline
Public response
Who is involved?
What affects it?
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.