Planning Atlas
Planning AtlasLewishamBrockley wardDC/21/123920
Planning application · Lewisham

DC/21/123920.

GOLDSMITHS COLLEGE, LEWISHAM WAY, LONDON, SE14 6YZ

Full / Other Planning at GOLDSMITHS COLLEGE, LEWISHAM WAY, LONDON, SE14 6YZ, received 15 Oct 2021 — approved on 10 Dec 2021 (delegated, Alfie Williams).

LewishamBrockleySE14 6YZDC/21/123920
ApprovedRefusedOther
At a glance · this applicationLewisham profile →
Approved
Outcome
10 Dec 2021
8 wks
Decision time
inside the 8-week target
Conditions
not captured
17
Documents
17 linked
0
Objections
0 in support
No
Appeal
none recorded
Record from the Lewisham planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Construction of a plant enclosure on the roof, together with extensions and the refurbishment of existing energy centre to replace gas-powered boilers with a low carbon air-source heat pump system, new stairways at ground and 1st floor levels at Goldsmiths College, Lewisham Way SE14, partial demolition and rebuilding of external storage facilities and demolition of existing planter to construct new substation fronting onto Dixon Road and replacement windows.

Reference
DC/21/123920
Type
Full Planning Permission
Agent / consultant
Case officer
Postcode
SE14 6YZ
Council
Received
15 Oct 2021
Target date
10 Dec 2021
Decision date
10 Dec 2021
Decision route
Delegated (officer)
Status
Decided
Reference
DC/21/123920
Type
Full Planning Permission
Show all 15 rows
Agent / consultant
Case officer
Postcode
SE14 6YZ
Council
Received
15 Oct 2021
Target date
10 Dec 2021
Decision date
10 Dec 2021
Decision route
Delegated (officer)
Status
Decided
Documents

What was filed?

Document
Published
View
Delegated report
10 Dec 2021
Decision notice
10 Dec 2021
Redacted
18 Oct 2021
Gold-5th-zz-zz-dr-a-0470-
18 Oct 2021
Existing-plans
18 Oct 2021
Proposed-plans
18 Oct 2021
Existing elevations-sections
18 Oct 2021
Proposed-elevations-sections
18 Oct 2021
Design and access statement
18 Oct 2021
Gold-5th-zz-02-dr-a-1100-
18 Oct 2021
Delegated report
10 Dec 2021
Decision notice
10 Dec 2021
Redacted
18 Oct 2021
Show all 10 rows
Gold-5th-zz-zz-dr-a-0470-
18 Oct 2021
Existing-plans
18 Oct 2021
Proposed-plans
18 Oct 2021
Existing elevations-sections
18 Oct 2021
Proposed-elevations-sections
18 Oct 2021
Design and access statement
18 Oct 2021
Gold-5th-zz-02-dr-a-1100-
18 Oct 2021

Documents open on the Lewisham portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Approved on 10 Dec 2021, delegated decision by Alfie Williams — 8 weeks from submission.

Timeline

Date
Event
15 Oct 2021
Application received
10 Dec 2021
Statutory target date
10 Dec 2021
Delegated decision: Approved · Alfie Williams
15 Oct 2021
Application received
10 Dec 2021
Statutory target date
10 Dec 2021
Delegated decision: Approved · Alfie Williams

Public response

Measure
Count
Objections
0
In support
0
Total comments
0
Objections
0
In support
0
Total comments
0
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)