DC/25/141955.
DEPTFORD CHURCH STREET SITE, THAMES TUNNEL, LONDON
Full / Other Planning at DEPTFORD CHURCH STREET SITE, THAMES TUNNEL, LONDON, received 28 Oct 2025 — approved on 23 Dec 2025 (delegated, Max Curson).
What is it?
The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 formal application to discharge Schedule 3 Requirement DEPCS5 (Parts 3 and 4) (Contaminated Land) at the Deptford Church Street site.
Show all 14 rows
What was filed?
Documents open on the Lewisham portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗
What happened?
Approved on 23 Dec 2025, delegated decision by Max Curson — 8 weeks from submission.
Timeline
Public response
Who is involved?
What affects it?
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.