24/P0192.
DONHEAD PREPARATORY SCHOOL, 33 Edge Hill, Wimbledon, Merton, SW19 4NP
Full / Other Planning at DONHEAD PREPARATORY SCHOOL, 33 Edge Hill, Wimbledon, Merton, SW19 4NP, received 24 Jan 2024 — approved on 15 Apr 2024 (delegated, Stephen Hill).
What is it?
ERECTION OF CLASSROOM TO ACCOMMODATE A PRESCHOOL WITH ASSOCIATED MODIFICATIONS TO EXISTING TIMBER DECK AND REPOSITIONING OF EXISTING TENSILE FABRIC CANOPY.
Show all 15 rows
What was filed?
Documents open on the Merton portal. View the application page ↗
What happened?
Approved on 15 Apr 2024, delegated decision by Stephen Hill — 12 weeks from submission (4 over the 8-week target).
Timeline
Public response
Comment counts were not captured for this application.
Who is involved?
What affects it?
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.