Planning Atlas
AtlasPostcodeSE94BN
Dev
Session
Tier
Planning AtlasBromleyMottingham wardSE9 4BN
Postcode record · Bromley

SE9 4BN.

SE9 4BN has 17 known premises and 7 planning records — 4 approved of 7 decided (57.1%). 13 EPC records.

BromleyMottinghamSE9 4BN
Postcode SE9 4BN · boundary not held, centred on the postcodeApprovedRefusedOther7 on the map — every match
At a glance · this postcodeBromley profile →
17
Premises
known addresses (UPRNs)
7
Applications
7 decided
57.1%
Approval rate
4 approved · 2 refused
Median decision time
no reliable start and decision dates
13
EPC records
ratings C 6 · D 5 · E 2
7
Mapped applications
inside the postcode shape
Postcode unit boundary from Ordnance Survey; premises and applications inside it. Aggregates describe the area, not any single premises.
Property

What is it?

SE9 4BN has 17 known premises and 7 planning records — 4 approved of 7 decided (57.1%). 13 EPC records.

Premises

Name
Details
UPRN 100020432452
Show all 10 rows
UPRN 100020432454
UPRN 100020432456
UPRN 100020432457
UPRN 100020432458
UPRN 100020432459
UPRN 100020432460
Planning

What happened?

7 planning applications across the postcode; 4 approved of 7 decided (57.1%). Latest 7 shown.

Reference
Proposal · address
Type
Outcome
Date · distance
T1 Oak - Remove all deadwood. Prune secondary and tertiary growth away from overhead wires to give 1m clearance. Crown lift to clear properties by up to 4m. Reduce overextended laterals by up to 2m to rebalance crown. Crown thin by 25%.SUBJECT TO TPO 982 (16.3.1994)
2 Calcott Walk, Mottingham, London, SE9 4BN · premises record
Consent under Tree Preservation Orders
Approved
2020-11-20
Single storey rear extension, extending beyond the rear wall of the house as existing by 4m (beyond the original rear wall by 4m), for which the maximum height would be 3m (maximum height of proposed and previous extensions 3m), and for which the height of the eaves would be 3m (maximum eaves height of proposed and previous extensions 3m) - (42 Day Notification for Householder Permitted Development Prior Approval)
4 Calcott Walk, Mottingham, London, SE9 4BN · premises record
Prior approval Part 1 Class A.1(ea): Larger home extension
Not required
2018-10-09
Part one/two storey side extension
2 Calcott Walk, London, SE9 4BN · premises record
Householder planning permission
Refused
2008-02-22
Crown thin by 15% and cut back to give a clearance to the buildings of no more than 2 metres one oak tree in front garden SUBJECT TO TPO 982
2 Calcott Walk, London, SE9 4BN · premises record
Consent under Tree Preservation Orders
Approved
2007-10-24
Crown reduce by 20% one oak tree in front garden SUBJECT TO TPO 982
2 Calcott Walk, London, SE9 4BN · premises record
Consent under Tree Preservation Orders
Refused
2007-10-24
Two storey side extension
15 Calcott Walk, London, SE9 4BN · premises record
Full planning permission
Approved
2001-06-06
LAND ADJOINING 16 CALCOTT WALK SE9 SE9 4BNCHANGE OF USE FROM AMENITY LAND TO RESIDENTIAL WITH VEHICULAR ACCESS
Land Adj. To No. 16 , Calcott Walk, London · premises record
Full planning permission
Approved
1997-11-05
T1 Oak - Remove all deadwood. Prune secondary and tertiary growth away from overhead wires to give 1m clearance. Crown lift to clear properties by up to 4m. Reduce overextended laterals by up to 2m to rebalance crown. Crown thin by 25%.SUBJECT TO TPO 982 (16.3.1994)
2 Calcott Walk, Mottingham, London, SE9 4BN · premises record
Approved
2020-11-20
More
Consent under Tree Preservation Orders
Single storey rear extension, extending beyond the rear wall of the house as existing by 4m (beyond the original rear wall by 4m), for which the maximum height would be 3m (maximum height of proposed and previous extensions 3m), and for which the height of the eaves would be 3m (maximum eaves height of proposed and previous extensions 3m) - (42 Day Notification for Householder Permitted Development Prior Approval)
4 Calcott Walk, Mottingham, London, SE9 4BN · premises record
Not required
2018-10-09
More
Prior approval Part 1 Class A.1(ea): Larger home extension
Part one/two storey side extension
2 Calcott Walk, London, SE9 4BN · premises record
Refused
2008-02-22
More
Householder planning permission
Show all 7 rows
Crown thin by 15% and cut back to give a clearance to the buildings of no more than 2 metres one oak tree in front garden SUBJECT TO TPO 982
2 Calcott Walk, London, SE9 4BN · premises record
Approved
2007-10-24
More
Consent under Tree Preservation Orders
Crown reduce by 20% one oak tree in front garden SUBJECT TO TPO 982
2 Calcott Walk, London, SE9 4BN · premises record
Refused
2007-10-24
More
Consent under Tree Preservation Orders
Two storey side extension
15 Calcott Walk, London, SE9 4BN · premises record
Approved
2001-06-06
More
Full planning permission
LAND ADJOINING 16 CALCOTT WALK SE9 SE9 4BNCHANGE OF USE FROM AMENITY LAND TO RESIDENTIAL WITH VEHICULAR ACCESS
Land Adj. To No. 16 , Calcott Walk, London · premises record
Approved
1997-11-05
More
Full planning permission

Building control

Building-control records are not yet collected for Bromley — the register is being gathered borough by borough (held so far: Lambeth, Brent, Ealing, Westminster, City and others).

Place

What affects it?

No mapped designation intersects a premises point in this postcode in the current build. Open any premises above for its own designation record.

Nearby postcodes and streets

Walk to the next area — linked where the Atlas has a record for it (pilot borough only for now).

People

Who is involved?

Applicants, agents and officers are attached per application; the current area build carries references only — the borough entity run adds the names here.

Development

What could it become?

Planning precedent7 applications and 7 mapped decisions in this postcode — precedent for what has been permitted and refused here.
Energy13 EPC records; ratings C: 6, D: 5, E: 2.
What is not assertedNo capacity, value or ownership claim is made at area level; those belong to individual premises records and their evidence.

Intent signals

Planning Atlas Pro

Ownership, finance and market signals recorded at addresses in this postcode — each with date and source. Signals are evidence of change, not a prediction.

3 intent signals recorded in this postcode
Repeat sale · Long hold
Subscribe to see the signals →
Boundary: OS Postcode Unit areas (Ordnance Survey), 2026-08-14. Planning records: canonical stage2. EPC: EPC register. Premises: OS AddressBase / UPRN.
SE9 4BN, Bromley: planning and property history | Planning Atlas