Full office refurbishment to Levels 2 & 3 at Almack. · received 15 Apr 2026 · Salus (Building Control & Fire Safety Consultants) Ltd
Strip out of existing boardroom, installation of new heat recovery unit and fresh air louvre. Installation of new soft finishes, power and data to accommodate 20 new desk positions. · received 2 Feb 2026
Part Fourth floor office fit out. · received 28 Feb 2025 · Confrere Building Control Ltd
Part Level 4 and full level 5 office fit out including the installation of an accommodation stair between both levels · received 11 Nov 2024 · Confrere Building Control Ltd
26-28 King Street : Internal alterations to the sixth floor of an existing office building, works consist creation of new meeting rooms and associated works. · received 8 Nov 2024 · Yorkshire Dales Building Consultancy Limited
26-28, King Street: Refurbishment to w/c areas and lift lobbies to 1st, 2nd and 3rd floors. · received 6 Aug 2024 · Shore Engineering Ltd
Third and seventh floor CAT B works at Almack House, 26-28 King Street. · received 23 Jul 2024 · Salus (Building Control & Fire Safety Consultants) Ltd
Almack House 26-28 King Street: CAT B Works of lower ground floor and ground floor. · received 29 May 2024 · Salus (Building Control & Fire Safety Consultants) Ltd
26-28 King Street: Cat A Fit out of the full floor plates to 4th , 5th and the refurbishment of the WCs, lift lobbies and creation of roof terraces at levels 4, 5 and 7. · received 20 Oct 2023 · Shore Engineering Ltd
26-28 King Street: Structural alterations to create opening from 7th floor to the roof for new staircase, extension of an existing roof top gantry to form a terrace. · received 13 Jun 2023 · Shore Engineering Ltd
Full office refurbishment to Levels 2 & 3 at Almack. · received 15 Apr 2026 · Salus (Building Control & Fire Safety Consultants) Ltd
Strip out of existing boardroom, installation of new heat recovery unit and fresh air louvre. Installation of new soft finishes, power and data to accommodate 20 new desk positions. · received 2 Feb 2026
Part Fourth floor office fit out. · received 28 Feb 2025 · Confrere Building Control Ltd
Show all 10 rows
Part Level 4 and full level 5 office fit out including the installation of an accommodation stair between both levels · received 11 Nov 2024 · Confrere Building Control Ltd
26-28 King Street : Internal alterations to the sixth floor of an existing office building, works consist creation of new meeting rooms and associated works. · received 8 Nov 2024 · Yorkshire Dales Building Consultancy Limited
26-28, King Street: Refurbishment to w/c areas and lift lobbies to 1st, 2nd and 3rd floors. · received 6 Aug 2024 · Shore Engineering Ltd
Third and seventh floor CAT B works at Almack House, 26-28 King Street. · received 23 Jul 2024 · Salus (Building Control & Fire Safety Consultants) Ltd
Almack House 26-28 King Street: CAT B Works of lower ground floor and ground floor. · received 29 May 2024 · Salus (Building Control & Fire Safety Consultants) Ltd
26-28 King Street: Cat A Fit out of the full floor plates to 4th , 5th and the refurbishment of the WCs, lift lobbies and creation of roof terraces at levels 4, 5 and 7. · received 20 Oct 2023 · Shore Engineering Ltd
26-28 King Street: Structural alterations to create opening from 7th floor to the roof for new staircase, extension of an existing roof top gantry to form a terrace. · received 13 Jun 2023 · Shore Engineering Ltd