Install a gas-fired boiler
Upgrading of fire escape corridor with fire stopping, fire doors, emergency lighting, fire detection and signage
Full Internal Fit-Out of Warehouse and Office Units
Installation of mezzanine floor
Alterations and refurbishment of industrial units to revert to the original warehouse use with two storey ancillary office / welfare blocks. Works to include: Over clad of existing roof. Relining of existing gutters. Replacement roof lights. Repairs to damaged external wall cladding. New / replacement block partitions to form offices at ground floor. CAT A fit out to offices. Refurbishment of roller shutter door. Alterations / refurbishment to internal and external doors (to reinstate as originally provided). Associated new / altered mechanical and electrical installations.
Alterations and refurbishment of industrial units to revert to the original warehouse use with two storey ancillary office / welfare blocks. Works to include: Over clad of existing roof. Relining of existing gutters. Replacement roof lights. Repairs to damaged external wall cladding. CAT A fit out to offices. Refurbishment of roller shutter door. Alterations / refurbishment to internal and external doors (to reinstate as originally provided). Associated new / altered mechanical and electrical installations.
Circuit alteration or addition in a special location
Alterations and refurbishment of industrial units to revert to the original warehouse use with two storey ancillary office / welfare blocks, following removal of tenants fixtures and fittings. Works to include: Roof repairs & replacement roof lights. Reinstatement of external wall cladding / brickwork to original condition, including infill of tenant installed loading doors to the side elevation. Replacement overhead sectional loading bay doors to the front elevation. Reinstate ground floor slab following removal of tenant sub structure works. Replacement fire exit doors (subject to survey of existing doors). Replacement ceilings within ancillary office / welfare blocks. Mechanical and electrical installations including new LED lighting, emergency lighting, fire alarm, and office / welfare heating & hot water
Reinstatement of compartment wall between units
Raised storage / mezzanine floor platform to existing warehouse