Power upgrade works and associated works. · received 1 Jul 2026 · Socotec Building Control Ltd
Internal alterations to existing building to include reconfiguration of existing 4th Floor office space, new mezzanine and associated alterations to existing fixed building, · received 18 Jun 2026 · Socotec Building Control Ltd
Alterations and refit of retail unit including installation of mezzanine and new mechanical and electrical systems · received 15 Jan 2025 · STMC (Building Control) Ltd
Fit out and refurbishment works to ground, 1st, 2nd and 3rd floors. Internal walls to define front of house retail and back of house storage areas, toilets and welfare spaces and offices; building MEP including heating, lighting and ventilation plant and services distribution; fire alarm system; raised access floors; wall, floor and ceiling finishes. · received 9 Oct 2024 · Shore Engineering Ltd
Fit out to ground floor retail unit. · received 24 Sept 2024 · Sweco Building Control Ltd
Major alterations taking ground, 1st, 2nd. 3rd and 4th floors back to a shell and core standard including structural modifications of existing steelwork framing, new CLT slabs, associated soffit fire treatment, replacement sprinkler system, new lifts, new accommodation stair, new stair and lift lobbies, secondary glazing to upper floors; new shopfront glazing and entrance doors at ground floor level and Kentledge adaptation to Basement 3 all to shell and core standard only. · received 21 Feb 2024 · Shore Engineering Ltd
Mixed-use redevelopment: material alterations to: Upgrade thermal performance of existing external windows and doors and replacement of mechanical and electrical services throughout the building including removal of gas fired services. Level 0: subdivision of main retail unit to create "Retail Unit IKEA" which spans B2, B1 and L0 and L0-mezzanine; "Retail Unit 1", accessed from Oxford Street; and "Retail Unit 2", accessed from corner of Regent Street and Great Castle Street. Levels 1, 2 and 3: refurbishment work to switch from retail (Topshop) to office accommodation. Levels 4 and 4-mezzanine: refurbishment of existing office accommodation. Level 5 / roof: new mechanical and electrical plant and creation of accessible terraces for office staff to the south and east elevations · received 17 Feb 2022 · Socotec Building Control Ltd
Back of house alterations & fit out works to 3rd floor at Nike Town London. · received 25 Feb 2020 · Studious Ltd
Power upgrade works and associated works. · received 1 Jul 2026 · Socotec Building Control Ltd
Internal alterations to existing building to include reconfiguration of existing 4th Floor office space, new mezzanine and associated alterations to existing fixed building, · received 18 Jun 2026 · Socotec Building Control Ltd
Alterations and refit of retail unit including installation of mezzanine and new mechanical and electrical systems · received 15 Jan 2025 · STMC (Building Control) Ltd
Show all 8 rows
Fit out and refurbishment works to ground, 1st, 2nd and 3rd floors. Internal walls to define front of house retail and back of house storage areas, toilets and welfare spaces and offices; building MEP including heating, lighting and ventilation plant and services distribution; fire alarm system; raised access floors; wall, floor and ceiling finishes. · received 9 Oct 2024 · Shore Engineering Ltd
Fit out to ground floor retail unit. · received 24 Sept 2024 · Sweco Building Control Ltd
Major alterations taking ground, 1st, 2nd. 3rd and 4th floors back to a shell and core standard including structural modifications of existing steelwork framing, new CLT slabs, associated soffit fire treatment, replacement sprinkler system, new lifts, new accommodation stair, new stair and lift lobbies, secondary glazing to upper floors; new shopfront glazing and entrance doors at ground floor level and Kentledge adaptation to Basement 3 all to shell and core standard only. · received 21 Feb 2024 · Shore Engineering Ltd
Mixed-use redevelopment: material alterations to: Upgrade thermal performance of existing external windows and doors and replacement of mechanical and electrical services throughout the building including removal of gas fired services. Level 0: subdivision of main retail unit to create "Retail Unit IKEA" which spans B2, B1 and L0 and L0-mezzanine; "Retail Unit 1", accessed from Oxford Street; and "Retail Unit 2", accessed from corner of Regent Street and Great Castle Street. Levels 1, 2 and 3: refurbishment work to switch from retail (Topshop) to office accommodation. Levels 4 and 4-mezzanine: refurbishment of existing office accommodation. Level 5 / roof: new mechanical and electrical plant and creation of accessible terraces for office staff to the south and east elevations · received 17 Feb 2022 · Socotec Building Control Ltd
Back of house alterations & fit out works to 3rd floor at Nike Town London. · received 25 Feb 2020 · Studious Ltd