Flats 33 & 34: Material change of use of two 2nd floor flats to form one flat (works to incorporate material alterations to structure, controlled services, fittings and thermal elements) · received 18 Oct 2024 · Total Building Control Ltd
Move non-structural internal hallway wall and raise internal ceiling (works to incorporate material alterations to structure, controlled services, fittings and thermal elements) · received 10 Jul 2024 · Total Building Control Ltd
Flats 71 & 72: Material change of use of two 5th floor flats to form one flat (works to incorporate material alterations to structure, controlled services, fittings and thermal elements). · received 29 Sept 2023 · Total Building Control Ltd
Flats 71 & 72: Amalgamation of both properties into one larger dwelling. Interior alterations only. · received 26 Jul 2023 · London Building Control Ltd
Flat 21 & 22, The Baynards: Material change of use from 2 flats to form a single flat (works to incorporate material alterations to structure, controlled services, fittings and thermal elements). · received 16 Feb 2023 · Total Building Control Ltd
Internal alterations to flat. · received 28 Nov 2022 · Salus (Building Control & Fire Safety Consultants) Ltd
Flat 3 and Flat 4: Material change of use, internal structural alterations and refurbishment to combine Flat 3 and Flat 4, including all associated work. · received 7 Nov 2022 · Thames Building Control Ltd
Refurbishment internally, changes to positions of some partition walls, new doors, new kitchen and bathroom fittings, change French doors. Works to allow for wheelchair access inside the flat. · received 1 Dec 2021 · Wetherby Associates Ltd
Internal alterations to create open plan flat with protected lobby. · received 8 Jan 2021
Replacement of an old unvented hot water cylinder with a new unvented hot water cylinder.
Flats 33 & 34: Material change of use of two 2nd floor flats to form one flat (works to incorporate material alterations to structure, controlled services, fittings and thermal elements) · received 18 Oct 2024 · Total Building Control Ltd
Move non-structural internal hallway wall and raise internal ceiling (works to incorporate material alterations to structure, controlled services, fittings and thermal elements) · received 10 Jul 2024 · Total Building Control Ltd
Flats 71 & 72: Material change of use of two 5th floor flats to form one flat (works to incorporate material alterations to structure, controlled services, fittings and thermal elements). · received 29 Sept 2023 · Total Building Control Ltd
Show all 10 rows
Flats 71 & 72: Amalgamation of both properties into one larger dwelling. Interior alterations only. · received 26 Jul 2023 · London Building Control Ltd
Flat 21 & 22, The Baynards: Material change of use from 2 flats to form a single flat (works to incorporate material alterations to structure, controlled services, fittings and thermal elements). · received 16 Feb 2023 · Total Building Control Ltd
Internal alterations to flat. · received 28 Nov 2022 · Salus (Building Control & Fire Safety Consultants) Ltd
Flat 3 and Flat 4: Material change of use, internal structural alterations and refurbishment to combine Flat 3 and Flat 4, including all associated work. · received 7 Nov 2022 · Thames Building Control Ltd
Refurbishment internally, changes to positions of some partition walls, new doors, new kitchen and bathroom fittings, change French doors. Works to allow for wheelchair access inside the flat. · received 1 Dec 2021 · Wetherby Associates Ltd
Internal alterations to create open plan flat with protected lobby. · received 8 Jan 2021
Replacement of an old unvented hot water cylinder with a new unvented hot water cylinder.