26.00324.IN · received 23 Feb 2026
Replacement of roof covering, redecoration of front elevation and potential improvement of fire compartmentation. · received 23 Jan 2026 · Stroma Building Control Ltd
Internal Refurbishment of Lower Ground Level and Ground Level consisting of refurbishment of kitchen, showers, utility, MEP services, proposed wall opening for open plan living dining, basement stair refurbishment, repair of basement roof to meet energy performance standards and installation of rooflight as well as installation of new rear doors · received 7 Apr 2025 · London Building Control Ltd
Reconfiguration & Refurbishment of 3rd Floor / 4th Floor Flat with Removal of Walls, Refitting of Kitchen & Bathroom Ancillary Works. · received 23 Dec 2024 · Thames Building Control Ltd
Work on the kitchen electrics - installing new sockets in the kitchen and work on existing switches - and flat lightning (ceiling downlights). Removal of two existing fire curtains and installation of one pocket door and one new fire curtain to maintain the hallway. · received 4 Sept 2024 · London Building Control Ltd
Full internal refurbishment and remodelling. · received 7 Aug 2024 · The Building Inspectors Ltd
Replace 2 fire entrance doors: Flat E and Flat B, · received 7 May 2024 · London Building Control Ltd
Replacement of fire doors in flats B, C, D, & E. · received 23 Jan 2023 · Cook Brown Building Control Ltd
Replacement of fire doors in Flats A, B, C, D & E and 1 communal fire door. · received 18 Jan 2023 · Cook Brown Building Control Ltd
Replacement of fire doors in flats A, B, C, D, & E. · received 17 Jan 2023
26.00324.IN · received 23 Feb 2026
Replacement of roof covering, redecoration of front elevation and potential improvement of fire compartmentation. · received 23 Jan 2026 · Stroma Building Control Ltd
Internal Refurbishment of Lower Ground Level and Ground Level consisting of refurbishment of kitchen, showers, utility, MEP services, proposed wall opening for open plan living dining, basement stair refurbishment, repair of basement roof to meet energy performance standards and installation of rooflight as well as installation of new rear doors · received 7 Apr 2025 · London Building Control Ltd
Show all 10 rows
Reconfiguration & Refurbishment of 3rd Floor / 4th Floor Flat with Removal of Walls, Refitting of Kitchen & Bathroom Ancillary Works. · received 23 Dec 2024 · Thames Building Control Ltd
Work on the kitchen electrics - installing new sockets in the kitchen and work on existing switches - and flat lightning (ceiling downlights). Removal of two existing fire curtains and installation of one pocket door and one new fire curtain to maintain the hallway. · received 4 Sept 2024 · London Building Control Ltd
Full internal refurbishment and remodelling. · received 7 Aug 2024 · The Building Inspectors Ltd
Replace 2 fire entrance doors: Flat E and Flat B, · received 7 May 2024 · London Building Control Ltd
Replacement of fire doors in flats B, C, D, & E. · received 23 Jan 2023 · Cook Brown Building Control Ltd
Replacement of fire doors in Flats A, B, C, D & E and 1 communal fire door. · received 18 Jan 2023 · Cook Brown Building Control Ltd
Replacement of fire doors in flats A, B, C, D, & E. · received 17 Jan 2023