Energy retrofit of the flat. Soft Strip, drying of the external fabric which has been damaged by previous leaks, repair and insulation of the existing floor, internal insulation of the external walls, insulation of the bedrooms' ceiling. Updating plumbing and electricity (whole flat rewire), new en-suite bathroom and shared bathroom, new kitchen, new inbuilt-furniture carpentry and decoration. · received 17 Jun 2024 · Plans Approved Conditionally · House Of Bricoleurs
Replacement of 6 communal doors to stair K and corridors C, D, E, G & 9. · received 14 Jul 2023 · Cook Brown Building Control Ltd
Full Refurbishment including New Floors, Doors, Kitchen, Bathrooms, New Electrics, Plumbing & Underfloor Heating. · received 19 Jun 2023 · Building Control Partnership Ltd
Replacement of fire doors in flats A, B, C, D, F, I & six communal fire doors. · received 17 Jan 2023 · Cook Brown Building Control Ltd
Installation of stud partition · received 18 Jan 2022
Installation of Intercom systems for Network Homes Residents. · received 12 Aug 2021
Refurbishment and joining of ground floor and first floor apartment, including two internal structural openings, installation of new staircase and internal refurbishments. · received 18 Feb 2020 · Cook Brown Building Control Ltd
Installation of Intercom systems for Network Homes Residents.
Energy retrofit of the flat. Soft Strip, drying of the external fabric which has been damaged by previous leaks, repair and insulation of the existing floor, internal insulation of the external walls, insulation of the bedrooms' ceiling. Updating plumbing and electricity (whole flat rewire), new en-suite bathroom and shared bathroom, new kitchen, new inbuilt-furniture carpentry and decoration. · received 17 Jun 2024 · Plans Approved Conditionally · House Of Bricoleurs
Replacement of 6 communal doors to stair K and corridors C, D, E, G & 9. · received 14 Jul 2023 · Cook Brown Building Control Ltd
Full Refurbishment including New Floors, Doors, Kitchen, Bathrooms, New Electrics, Plumbing & Underfloor Heating. · received 19 Jun 2023 · Building Control Partnership Ltd
Show all 8 rows
Replacement of fire doors in flats A, B, C, D, F, I & six communal fire doors. · received 17 Jan 2023 · Cook Brown Building Control Ltd
Installation of stud partition · received 18 Jan 2022
Installation of Intercom systems for Network Homes Residents. · received 12 Aug 2021
Refurbishment and joining of ground floor and first floor apartment, including two internal structural openings, installation of new staircase and internal refurbishments. · received 18 Feb 2020 · Cook Brown Building Control Ltd
Installation of Intercom systems for Network Homes Residents.