Single storey rear extension, extending beyond the rear wall of the original house by 4m, for which the maximum height would be 3.5m, and for which the height of the eaves would be 2.5m (42 Day Notification for Householder Permitted Development Prior Approval)
Insertion of rooflight, rearrangement of fenestration and replace existing cladding panel with render board and finish with render to the existing single storey rear extension. Render to the existing garage building. Change of roof tiles to the existing main dwellinghouse.LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)
Single storey rear extension, extending beyond the rear wall of the original house by 4m, for which the maximum height would be 3.5m, and for which the height of the eaves would be 2.5m (42 Day Notification for Householder Permitted Development Prior Approval)
Insertion of rooflight, rearrangement of fenestration and replace existing cladding panel with render board and finish with render to the existing single storey rear extension. Render to the existing garage building. Change of roof tiles to the existing main dwellinghouse.LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)
Building-control records are not yet collected for Bromley — the register is being gathered borough by borough (held so far: Lambeth, Brent, Ealing, Westminster, City and others).
Place
What affects it?
No mapped designation intersects a premises point in this postcode in the current build. Open any premises above for its own designation record.
Nearby postcodes and streets
Walk to the next area — linked where the Atlas has a record for it (pilot borough only for now).
Planning precedent17 applications and 17 mapped decisions in this postcode — precedent for what has been permitted and refused here.
Energy12 EPC records; ratings C: 2, D: 9, E: 1.
What is not assertedNo capacity, value or ownership claim is made at area level; those belong to individual premises records and their evidence.
Intent signals
Planning Atlas Pro
Ownership, finance and market signals recorded at addresses in this postcode — each with date and source. Signals are evidence of change, not a prediction.
Signal
Evidence
Long hold · 24 Jul 1996
last sale £68,000 · 29 yrs held · 6 PORTLAND ROAD · source hmlr_ppd
Long hold · 15 Dec 1995
last sale £78,000 · 30 yrs held · 20 PORTLAND ROAD · source hmlr_ppd
Long hold · 24 Jul 1996
last sale £68,000 · 29 yrs held · 6 PORTLAND ROAD · source hmlr_ppd
Long hold · 15 Dec 1995
last sale £78,000 · 30 yrs held · 20 PORTLAND ROAD · source hmlr_ppd
Boundary: OS Postcode Unit areas (Ordnance Survey), 2026-08-14. Planning records: canonical stage2. EPC: EPC register. Premises: OS AddressBase / UPRN.
BR1 5BD, Bromley: planning and property history | Planning Atlas