Details pursuant to condition 15 (car park management and allocation scheme) of Variation of Conditions reference 19/3915, dated 2nd April 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156, dated 24th May 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 14 (landscaping) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 19 (highway works) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 17 (construction method statement) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 16 (external plant noise) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core. New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 20 (communal television system/satellite dish) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core. New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 10 (remediation strategy) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 17 (construction method statement) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 12 (building regulations requirement M4(2) and M4(3)) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 9 (materials) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 15 (car park management and allocation scheme) of Variation of Conditions reference 19/3915, dated 2nd April 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156, dated 24th May 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 14 (landscaping) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 19 (highway works) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 17 (construction method statement) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 16 (external plant noise) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core. New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 20 (communal television system/satellite dish) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core. New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 10 (remediation strategy) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 17 (construction method statement) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 12 (building regulations requirement M4(2) and M4(3)) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Details pursuant to condition 9 (materials) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Building-control records are not yet collected for Brent — the register is being gathered borough by borough (held so far: Lambeth, Brent, Ealing, Westminster, City and others).
Place
What affects it?
Every mapped designation touching a premises in this postcode, with how many of its 11 premises each one covers.
Designation
Coverage
Article 4 Direction Area
Article 4 for Town Centres - Wembley · reference A4D_TC16 · covers 11 of 11 premises. Some normally permitted changes may require planning permission.
Article 4 Direction Area
Article 4 for Town Centres - Wembley · reference A4D_TC16 · covers 11 of 11 premises. Some normally permitted changes may require planning permission.
People
Who is involved?
Named on the latest 22 applications in this postcode — the party who applied, not the owner or occupier.
Planning precedent22 applications and 0 mapped decisions in this postcode — precedent for what has been permitted and refused here.
EnergyNo EPC records joined yet.
What is not assertedNo capacity, value or ownership claim is made at area level; those belong to individual premises records and their evidence.
Intent signals
Planning Atlas Pro
Ownership, finance and market signals recorded at addresses in this postcode — each with date and source. Signals are evidence of change, not a prediction.
No intent signal is currently recorded in this postcode.