Planning Atlas
AtlasBrentHA9 8DA
Postcode record · Brent

HA9 8DA.

HA9 8DA has 11 known premises and 22 planning records — 10 approved of 22 decided (45.5%).

Postcode unitBrentBoundary not available
BrentHA9 8DA
No OS boundary is held for this postcode yet, so no shape is drawn.
At a glance · this postcodeBrent profile →
11
Premises
known addresses (UPRNs)
22
Applications
22 decided
45.5%
Approval rate
10 approved · 9 refused
0
EPC records
none recorded
0
Mapped applications
shape not available
Postcode unit boundary from Ordnance Survey; premises and applications inside it. Aggregates describe the area, not any single premises.
Property

What is it?

HA9 8DA has 11 known premises and 22 planning records — 10 approved of 22 decided (45.5%).

Premises

Planning

What happened?

22 planning applications across the postcode; 10 approved of 22 decided (45.5%). Latest 22 shown.

Reference
Proposal · address
Type
Outcome
Date · distance
Details pursuant to condition 15 (car park management and allocation scheme) of Variation of Conditions reference 19/3915, dated 2nd April 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156, dated 24th May 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Gary Barrett · Agent Wimshurst Pelleriti · Officer Jasmin Tailor
Conditions pursuant to a full permission
Refused
2022-03-29
Details pursuant to condition 14 (landscaping) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer June Taylor
Conditions pursuant to a full permission
Approved
2021-05-06
Details pursuant to condition 19 (highway works) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer Iman Abdulkadir
Conditions pursuant to a full permission
Refused
2021-02-05
Details pursuant to condition 17 (construction method statement) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Damian McGeary · Officer Sabrina Mohammed
Conditions pursuant to a full permission
Approved
2020-11-04
Details pursuant to condition 16 (external plant noise) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core. New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer Lisa McCann
Conditions pursuant to a full permission
Refused
2020-11-02
Details pursuant to condition 20 (communal television system/satellite dish) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core. New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer Lisa McCann
Conditions pursuant to a full permission
Approved
2020-11-02
Details pursuant to condition 10 (remediation strategy) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer June Taylor
Conditions pursuant to a full permission
Approved
2020-07-20
Details pursuant to condition 17 (construction method statement) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer Lisa McCann
Conditions pursuant to a full permission
Refused
2020-06-24
Details pursuant to condition 12 (building regulations requirement M4(2) and M4(3)) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer Lisa McCann
Conditions pursuant to a full permission
Approved
2020-05-22
Details pursuant to condition 9 (materials) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer Lisa McCann
Conditions pursuant to a full permission
Approved
2020-05-22
Details pursuant to condition 15 (car park management and allocation scheme) of Variation of Conditions reference 19/3915, dated 2nd April 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156, dated 24th May 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Gary Barrett · Agent Wimshurst Pelleriti · Officer Jasmin Tailor
Refused
2022-03-29
More
Conditions pursuant to a full permission
Details pursuant to condition 14 (landscaping) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer June Taylor
Approved
2021-05-06
More
Conditions pursuant to a full permission
Details pursuant to condition 19 (highway works) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer Iman Abdulkadir
Refused
2021-02-05
More
Conditions pursuant to a full permission
Show all 10 rows
Details pursuant to condition 17 (construction method statement) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Damian McGeary · Officer Sabrina Mohammed
Approved
2020-11-04
More
Conditions pursuant to a full permission
Details pursuant to condition 16 (external plant noise) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core. New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer Lisa McCann
Refused
2020-11-02
More
Conditions pursuant to a full permission
Details pursuant to condition 20 (communal television system/satellite dish) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core. New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer Lisa McCann
Approved
2020-11-02
More
Conditions pursuant to a full permission
Details pursuant to condition 10 (remediation strategy) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer June Taylor
Approved
2020-07-20
More
Conditions pursuant to a full permission
Details pursuant to condition 17 (construction method statement) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer Lisa McCann
Refused
2020-06-24
More
Conditions pursuant to a full permission
Details pursuant to condition 12 (building regulations requirement M4(2) and M4(3)) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer Lisa McCann
Approved
2020-05-22
More
Conditions pursuant to a full permission
Details pursuant to condition 9 (materials) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.
Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA · premises record
Applicant Mr Shane Burns · Agent Wimshurst Pelleriti · Officer Lisa McCann
Approved
2020-05-22
More
Conditions pursuant to a full permission

Building control

Building-control records are not yet collected for Brent — the register is being gathered borough by borough (held so far: Lambeth, Brent, Ealing, Westminster, City and others).

Place

What affects it?

Every mapped designation touching a premises in this postcode, with how many of its 11 premises each one covers.

Designation
Coverage
Article 4 Direction Area
Article 4 for Town Centres - Wembley · reference A4D_TC16 · covers 11 of 11 premises. Some normally permitted changes may require planning permission.
Article 4 Direction Area
Article 4 for Town Centres - Wembley · reference A4D_TC16 · covers 11 of 11 premises. Some normally permitted changes may require planning permission.
People

Who is involved?

Named on the latest 22 applications in this postcode — the party who applied, not the owner or occupier.

Name
Details
Applicant on 10 applications
Applicant on 1 application
Applicant on 1 application
Applicant on 1 application
Applicant on 1 application
Applicant on 1 application
Agent on 11 applications
Agent on 3 applications
Case officer on 8 applications
Case officer on 5 applications
Applicant on 10 applications
Applicant on 1 application
Applicant on 1 application
Show all 10 rows
Applicant on 1 application
Applicant on 1 application
Applicant on 1 application
Agent on 11 applications
Agent on 3 applications
Case officer on 8 applications
Case officer on 5 applications
Development

What could it become?

Planning precedent22 applications and 0 mapped decisions in this postcode — precedent for what has been permitted and refused here.
EnergyNo EPC records joined yet.
What is not assertedNo capacity, value or ownership claim is made at area level; those belong to individual premises records and their evidence.

Intent signals

Planning Atlas Pro

Ownership, finance and market signals recorded at addresses in this postcode — each with date and source. Signals are evidence of change, not a prediction.

No intent signal is currently recorded in this postcode.

Planning records: canonical stage2. EPC: EPC register. Premises: OS AddressBase / UPRN.
HA9 8DA, Brent: Planning and Property History | Planning Atlas