22/AP/1073.
Full / Other Planning at Unit 4 (Vacant), Unit 5 (Marks And Spencer And Unit 6 (Wh Smiths) Upper London Bridge Station Concourse Level (Beneath The Shard Building) 32 London Bridge Street, received 22 Mar 2022 — approved on 15 Jul 2022 by committee.
What is it?
Extend the existing footprint of Unit 5 (Marks and Spencer) to include existing lobby area and Unit 4 (vacant) and part of the existing concourse and relocating the entrance to Unit 5 and adjacent Unit 6 (WH Smiths) to face the concourse. Installation of new shopfront (including roller shutters) to Unit 5 and 6.
Show all 15 rows
What was filed?
Documents open on the Southwark portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗
What happened?
Approved on 15 Jul 2022, determined by the planning committee — 16 weeks from submission (8 over the 8-week target).
Timeline
Show all 4 rows
Public response
Who is involved?
Show all 4 rows
What affects it?
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.