23/AP/3273.
South Dock Marina St Georges Wharf Rope Street London Southwark SE16
Full / Other Planning at South Dock Marina St Georges Wharf Rope Street London Southwark SE16, received 24 Nov 2023 — approved on 20 Nov 2025 by committee.
What is it?
Refurbishment of South Dock Marina boatyard to include demolition and removal of all buildings and structures on site, renew services infrastructure, new electricity substation, underground drainage, and hard standings and provide new workshops, studios, toilets showers laundry and associated landscape. Construct new covered boat repair areas with associated gantry and staircase. Removal of the existing crane and replace with new crane, pontoon adjacent to the crane and associated public realm works to the crane area. Addition of new trees to the river walk.
Show all 15 rows
What was filed?
Show all 10 rows
Documents open on the Southwark portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗
What happened?
Approved on 20 Nov 2025, determined by the planning committee — 104 weeks from submission (96 over the 8-week target).
Timeline
Show all 4 rows
Public response
Who is involved?
Show all 4 rows
What affects it?
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)