DM2018/01680.
Full Application at Land To The East And West Of London Road, Including London Road Rail Bridge, Hackbridge. London Road Hackbridge London SM6 7HW, received 17 Sep 2018 — approved on 14 Dec 2018 by committee.
What is it?
Installation of pipeline including the construction of pipe bridge to connect between an approved Energy Recovery Facility (and its associated approved pipelines) and a housing development site, the 'Felnex Site' to deliver District Heating provision at Land adjacent to the east and west of London Road, including the existing London Road railway bridge, London Road, Hackbridge.
Show all 16 rows
What was filed?
No documents are recorded for this application.
Documents open on the Sutton portal. View the application page ↗
What happened?
Approved on 14 Dec 2018, determined by the planning committee — 13 weeks from submission (5 over the 8-week target).
Timeline
Show all 4 rows
Public response
Who is involved?
Show all 4 rows
What affects it?
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.