Planning application · Sutton

DM2023/00373.

27 Clifton Road Wallington SM6 8AL

Full / Other Planning at 27 Clifton Road Wallington SM6 8AL, received 6 Mar 2023 — approved on 8 Mar 2024 by committee.

SuttonWallington NorthSM6 8ALDM2023/00373
ApprovedRefusedOther
At a glance · this applicationSutton profile →
Approved
Outcome
8 Mar 2024
53 wks
Decision time
45 wks over the 8-week target
Conditions
not captured
21
Documents
21 linked
6
Objections
0 in support
No
Appeal
none recorded
Record from the Sutton planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Demolition of existing detached bungalow and erection of 2 semi-detached dwellings.

Reference
DM2023/00373
Type
Full Application
Agent / consultant
Case officer
Postcode
SM6 8AL
Council
Received
6 Mar 2023
Validated
23 Mar 2023
Target date
29 Feb 2024
Decision date
8 Mar 2024
Decision route
Planning committee
Status
Application Granted
Reference
DM2023/00373
Type
Full Application
Show all 16 rows
Agent / consultant
Case officer
Postcode
SM6 8AL
Council
Received
6 Mar 2023
Validated
23 Mar 2023
Target date
29 Feb 2024
Decision date
8 Mar 2024
Decision route
Planning committee
Status
Application Granted
Documents

What was filed?

Document
Published
View
DECISION NOTICE GRANT FUL
8 Mar 2024
EXTERNAL FACING MATERIALS
28 Feb 2024
Revised Drawing
2 Feb 2024
PROPOSED BLOCK PLAN
2 Feb 2024
Revised Drawing
23 Nov 2023
ENERGY STATEMENT
23 Nov 2023
SUDS
23 Nov 2023
MR PATRICK WHITTER
13 Oct 2023
MR PATRICK WHITTER
2 May 2023
MX POLLUTION CONTROL
21 Apr 2023
DECISION NOTICE GRANT FUL
8 Mar 2024
EXTERNAL FACING MATERIALS
28 Feb 2024
Revised Drawing
2 Feb 2024
Show all 10 rows
PROPOSED BLOCK PLAN
2 Feb 2024
Revised Drawing
23 Nov 2023
ENERGY STATEMENT
23 Nov 2023
SUDS
23 Nov 2023
MR PATRICK WHITTER
13 Oct 2023
MR PATRICK WHITTER
2 May 2023
MX POLLUTION CONTROL
21 Apr 2023

Documents open on the Sutton portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Approved on 8 Mar 2024, determined by the planning committee — 53 weeks from submission (45 over the 8-week target).

Timeline

Date
Event
6 Mar 2023
Application received
23 Mar 2023
Application validated
29 Feb 2024
Statutory target date
8 Mar 2024
Committee decision: Approved
6 Mar 2023
Application received
23 Mar 2023
Application validated
29 Feb 2024
Statutory target date
Show all 4 rows
8 Mar 2024
Committee decision: Approved

Public response

Measure
Count
Objections
6
In support
0
Total comments
6
Objections
6
In support
0
Total comments
6
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Determined at committee
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Show all 4 rows
Determined at committee
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.