Planning Atlas
Planning AtlasSuttonSutton North wardDM2023/00466
Planning application · Sutton

DM2023/00466.

Greenshaw High School Grennell Road Sutton SM1 3DY

Full / Other Planning at Greenshaw High School Grennell Road Sutton SM1 3DY, received 23 Mar 2023 — approved on 3 Aug 2023 by committee.

SuttonSutton NorthSM1 3DYDM2023/00466
ApprovedRefusedOther
At a glance · this applicationSutton profile →
Approved
Outcome
3 Aug 2023
19 wks
Decision time
11 wks over the 8-week target
Conditions
not captured
105
Documents
105 linked
0
Objections
3 in support
No
Appeal
none recorded
Record from the Sutton planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Part demolition of several buildings, erection of two part two part three storey buildings, erection of two part two part three storey temporary buildings throughout build of permanent buildings, hard and soft landscaping, new entrance from Grennell Road, new cycle and car parking.

Reference
DM2023/00466
Type
Full Application
Agent / consultant
Case officer
Postcode
SM1 3DY
Council
Received
23 Mar 2023
Validated
12 Apr 2023
Target date
26 May 2023
Decision date
3 Aug 2023
Decision route
Planning committee
Status
Application Granted
Reference
DM2023/00466
Type
Full Application
Show all 16 rows
Agent / consultant
Case officer
Postcode
SM1 3DY
Council
Received
23 Mar 2023
Validated
12 Apr 2023
Target date
26 May 2023
Decision date
3 Aug 2023
Decision route
Planning committee
Status
Application Granted
Documents

What was filed?

Document
Published
View
LONDON FIRE BRIGADE COMMENTS
10 Oct 2023
DECISION NOTICE GRANT FUL
3 Aug 2023
REVISED BAT SURVEYS
28 Jul 2023
REVISED PRA (STRUCTURES AND TREES)
28 Jul 2023
LLFA FLOW REPORTS (1 IN 30; 1 IN 100)
26 Jul 2023
LLFA FLOW REPORTS (1 IN 30; 1 IN 100)
26 Jul 2023
MR DAVID NWACHUKWU
25 Jul 2023
MR PATRICK WHITTER
20 Jul 2023
APPLICANT RESPONSE TO LLFA
17 Jul 2023
REVISED DRAINAGE CALCULATIONS
17 Jul 2023
LONDON FIRE BRIGADE COMMENTS
10 Oct 2023
DECISION NOTICE GRANT FUL
3 Aug 2023
REVISED BAT SURVEYS
28 Jul 2023
Show all 10 rows
REVISED PRA (STRUCTURES AND TREES)
28 Jul 2023
LLFA FLOW REPORTS (1 IN 30; 1 IN 100)
26 Jul 2023
LLFA FLOW REPORTS (1 IN 30; 1 IN 100)
26 Jul 2023
MR DAVID NWACHUKWU
25 Jul 2023
MR PATRICK WHITTER
20 Jul 2023
APPLICANT RESPONSE TO LLFA
17 Jul 2023
REVISED DRAINAGE CALCULATIONS
17 Jul 2023

Documents open on the Sutton portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Approved on 3 Aug 2023, determined by the planning committee — 19 weeks from submission (11 over the 8-week target).

Timeline

Date
Event
23 Mar 2023
Application received
12 Apr 2023
Application validated
26 May 2023
Statutory target date
3 Aug 2023
Committee decision: Approved
23 Mar 2023
Application received
12 Apr 2023
Application validated
26 May 2023
Statutory target date
Show all 4 rows
3 Aug 2023
Committee decision: Approved

Public response

Measure
Count
Objections
0
In support
3
Total comments
3
Objections
0
In support
3
Total comments
3
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Determined at committee
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Show all 4 rows
Determined at committee
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.