Record from the Tower Hamlets planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application
What is it?
Proposed recladding of existing external timber facades, replacement of existing timber cladding with an aluminium rainscreen cladding system, works will also include the replacement of existing soffit cladding boards, existing timber walkways are to be stripped and replaced with an aluminium replacement, balconies to be replaced with compliant aluminium decking and existing timber doorsets to the courtyard elevations will be replaced with compliant alternatives.
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.