PA/25/01777/NC.
Cubitt Town Junior And Infants Primary School, Glengall Grove, London, E14 3NE
Full / Other Planning at Cubitt Town Junior And Infants Primary School, Glengall Grove, London, E14 3NE — approved on 10 Dec 2025 (delegated, Caitlin McArthur).
What is it?
Proposed works at Cubitt Town School comprise the installation of new Air Source Heat Pumps (ASHPs) to replace the existing gas-fired heating and hot water systems. The upgrade will deliver a low -carbon solution in line the borough's sustainability objectives. Additionally a photovotaic (PV) panel array with a capacity of up to 100kWp will be installed, supporting onsite renewable energy generation.
Show all 16 rows
What was filed?
Show all 10 rows
Documents open on the Tower Hamlets portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗
What happened?
Approved on 10 Dec 2025, delegated decision by Caitlin McArthur.
Timeline
Public response
Who is involved?
What affects it?
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.