26/01898/FULL.
39 - 42 New Bond Street London W1S 2SQ
Full / Other Planning at 39 - 42 New Bond Street London W1S 2SQ, received 24 Mar 2026 — pending.
What is it?
Installation of plant at roof level within existing acoustic enclosure, new intake and extract louvres within existing openings, and associated pipework and servicing infrastructure. Installation of new HVAC and M&E systems, raised access flooring, new lighting and fit-out, formation of meeting rooms, and refurbishment of the ground floor entrance lobby; together with external alterations comprising. Internal and external refurbishment works, including full internal strip-out and reconfiguration at Levels 3 and 5. (Linked with 26/01899/LBC)
Show all 15 rows
What was filed?
Documents open on the Westminster portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗
What happened?
Status: Pending. No decision is recorded yet.
Timeline
Public response
Who is involved?
What affects it?
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.