Planning Atlas
Planning AtlasBarnetWoodhouse ward25/1357/FUL
Planning application · Barnet

25/1357/FUL.

72 Ingleway London N12 0QN

Full / Other Planning at 72 Ingleway London N12 0QN, received 28 Mar 2025 — refused on 16 Jun 2025 (delegated, Zakera Matin).

BarnetWoodhouseN12 0QN25/1357/FUL
ApprovedRefusedOther
At a glance · this applicationBarnet profile →
Refused
Outcome
16 Jun 2025
11 wks
Decision time
3 wks over the 8-week target
Conditions
not captured
17
Documents
17 linked
2
Objections
0 in support
No
Appeal
none recorded
Record from the Barnet planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Conversion of the existing dwelling into 3no. self contained flats including part single, part two storey side and rear extension with 1no. rooflight with new decking area. Single storey rear infill extension. Roof extension involving hip to gable, rear dormer window and 2no. front facing rooflights Associated refuse/recycling and cycle storage and amenity space

Reference
25/1357/FUL
Type
Full Application
Agent / consultant
Case officer
Postcode
N12 0QN
Council
Received
28 Mar 2025
Validated
25 Apr 2025
Target date
20 Jun 2025
Decision date
16 Jun 2025
Decision route
Delegated (officer)
Status
Refused
Reference
25/1357/FUL
Type
Full Application
Show all 16 rows
Agent / consultant
Case officer
Postcode
N12 0QN
Council
Received
28 Mar 2025
Validated
25 Apr 2025
Target date
20 Jun 2025
Decision date
16 Jun 2025
Decision route
Delegated (officer)
Status
Refused
Documents

What was filed?

Document
Published
View
DELEGATED REPORT
17 Jun 2025
DN: REFUSE FUL
16 Jun 2025
74 INGLE WAY, N12
19 May 2025
COMMENT(FULL)
3 May 2025
SECTION AA
25 Apr 2025
PROPOSED GROUND AND FIRST FLOOR
25 Apr 2025
PLANNING STATEMENT
24 Apr 2025
PROPOSED LOFT/ROOF
24 Apr 2025
PROPOSED ELEVATIONS
23 Apr 2025
EXISTING FLOOR PLANS
23 Apr 2025
DELEGATED REPORT
17 Jun 2025
DN: REFUSE FUL
16 Jun 2025
74 INGLE WAY, N12
19 May 2025
Show all 10 rows
COMMENT(FULL)
3 May 2025
SECTION AA
25 Apr 2025
PROPOSED GROUND AND FIRST FLOOR
25 Apr 2025
PLANNING STATEMENT
24 Apr 2025
PROPOSED LOFT/ROOF
24 Apr 2025
PROPOSED ELEVATIONS
23 Apr 2025
EXISTING FLOOR PLANS
23 Apr 2025

Documents open on the Barnet portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Refused on 16 Jun 2025, delegated decision by Zakera Matin — 11 weeks from submission (3 over the 8-week target).

Timeline

Date
Event
28 Mar 2025
Application received
25 Apr 2025
Application validated
20 Jun 2025
Statutory target date
16 Jun 2025
Delegated decision: Refused · Zakera Matin
28 Mar 2025
Application received
25 Apr 2025
Application validated
20 Jun 2025
Statutory target date
Show all 4 rows
16 Jun 2025
Delegated decision: Refused · Zakera Matin

Public response

Measure
Count
Objections
2
In support
0
Total comments
2
Objections
2
In support
0
Total comments
2
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.