Other at Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR, received 31 Oct 2025 — approved on 27 Feb 2026 (delegated, Amrith Sehmi).
What is it?
Partial discharge of Schedule 3 requirements relating to details of works to listed buildings for small clips to be installed onto each Lions heads piers to hold back the ring to the Lions Head moorings at the Blackfriars Bridge Foreshore Worksite pursuant to BLABF 11 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
Show all 15 rows
What was filed?
Documents open on the City Of London portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗
What happened?
Approved on 27 Feb 2026, delegated decision by Amrith Sehmi — 17 weeks from submission (9 over the 8-week target).
Timeline
Public response
Who is involved?
What affects it?
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.