Planning Atlas
Planning AtlasEnfieldUpper Edmonton ward20/02475/FUL
Planning application · Enfield

20/02475/FUL.

Meridian Studios Hawley Road London N18 3QU

Full / Other Planning at Meridian Studios Hawley Road London N18 3QU, received 5 Aug 2020 — approved on 7 Jan 2021 by committee.

EnfieldUpper EdmontonN18 3QU20/02475/FUL
ApprovedRefusedOther
At a glance · this applicationEnfield profile →
Approved
Outcome
7 Jan 2021
22 wks
Decision time
14 wks over the 8-week target
Conditions
not captured
70
Documents
70 linked
0
Objections
0 in support
No
Appeal
none recorded
Record from the Enfield planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Temporary redevelopment of the site for a period of 15 years in association with the use of the site as a film studios involving erection of three studio buildings, two ancillary storage buildings, two ancillary office buildings, one ancillary multi-function work-space building and associated works including refuse area, cycle storage and vehicle parking (E(g)(i), E(g)(iii) and B8).

Reference
20/02475/FUL
Type
Full
Applicant
Agent / consultant
Case officer
Postcode
N18 3QU
Council
Received
5 Aug 2020
Validated
21 Oct 2020
Target date
20 Jan 2021
Decision date
7 Jan 2021
Decision route
Planning committee
Status
Decided
Reference
20/02475/FUL
Type
Full
Show all 16 rows
Applicant
Agent / consultant
Case officer
Postcode
N18 3QU
Council
Received
5 Aug 2020
Validated
21 Oct 2020
Target date
20 Jan 2021
Decision date
7 Jan 2021
Decision route
Planning committee
Status
Decided
Documents

What was filed?

Document
Published
View
Committee Report
8 Jan 2021
committee drawings
8 Jan 2021
committee drawings
8 Jan 2021
committee drawings
8 Jan 2021
committee drawings
8 Jan 2021
committee drawings
8 Jan 2021
committee drawings
8 Jan 2021
committee report 5th January 2021
8 Jan 2021
Hub Elevation
7 Jan 2021
Elevations (Various)
7 Jan 2021
Committee Report
8 Jan 2021
committee drawings
8 Jan 2021
committee drawings
8 Jan 2021
Show all 10 rows
committee drawings
8 Jan 2021
committee drawings
8 Jan 2021
committee drawings
8 Jan 2021
committee drawings
8 Jan 2021
committee report 5th January 2021
8 Jan 2021
Hub Elevation
7 Jan 2021
Elevations (Various)
7 Jan 2021

Documents open on the Enfield portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Approved on 7 Jan 2021, determined by the planning committee — 22 weeks from submission (14 over the 8-week target).

Timeline

Date
Event
5 Aug 2020
Application received
21 Oct 2020
Application validated
20 Jan 2021
Statutory target date
7 Jan 2021
Committee decision: Approved
5 Aug 2020
Application received
21 Oct 2020
Application validated
20 Jan 2021
Statutory target date
Show all 4 rows
7 Jan 2021
Committee decision: Approved

Public response

Measure
Count
Objections
0
In support
0
Total comments
0
Objections
0
In support
0
Total comments
0
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Determined at committee
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Show all 4 rows
Determined at committee
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.