Application
What is it?
Part single, part 2-storey side/rear extension, extension of rear dormer to side and front rooflight.
Documents open on the Enfield portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗
Decision
What happened?
Refused on 25 Apr 2025, delegated decision by Jeremiah Ayerh — 8 weeks from submission.
Timeline
Date
Event
3 Mar 2025
Application received
28 Apr 2025
Statutory target date
25 Apr 2025
Delegated decision: Refused · Jeremiah Ayerh
3 Mar 2025
Application received
28 Apr 2025
Statutory target date
25 Apr 2025
Delegated decision: Refused · Jeremiah Ayerh
Why it was refused
Reason
As stated on the decision notice
1
The proposed development has failed to provide sufficient flood compensation for a 1 in 100-
year (+17% climate change) event which will increase the risk of flooding on site and elsewhere. The
proposal is therefore contrary to Section 14 of the National Planning Policy Framework (2024), to
policies SI12 and SI 13 of the London Plan (2021), to policies CP21 and CP28 of the Enfield Core
Strategy (2010), to policies DMD59, DMD60 and DMD61 of the Enfield Development Management
Document (2014), and the Enfield Strategic Flood Risk Assessment.
Dated: 25 April 2025
Authorised on behalf of:
Karen Page
Head of Planning and Building Control
Housing, Regeneration and Development Department
Enfield Council
PO Box 53, Civic Centre
Silver Street, Enfield
EN1 3XE
If you have any questions about this decision, please contact the planning officer
Jeremiah.ayerh@enfield.gov.uk.
List of plans and documents referred to in this Notice:
Title/Number Version TYPE
GD2716/05 Drawing
GD2716/04A Drawing
GD2716/03 Drawing
GD2716/01 Drawing
GD2716/02 Rev B Drawing
Flood Risk Assessment Supporting Information
APPEAL
Should you (an applicant or agent) feel aggrieved by the decision of the Council to either refuse
permission or to grant permission subject to conditions, you can
1
The proposed development has failed to provide sufficient flood compensation for a 1 in 100-
year (+17% climate change) event which will increase the risk of flooding on site and elsewhere. The
proposal is therefore contrary to Section 14 of the National Planning Policy Framework (2024), to
policies SI12 and SI 13 of the London Plan (2021), to policies CP21 and CP28 of the Enfield Core
Strategy (2010), to policies DMD59, DMD60 and DMD61 of the Enfield Development Management
Document (2014), and the Enfield Strategic Flood Risk Assessment.
Dated: 25 April 2025
Authorised on behalf of:
Karen Page
Head of Planning and Building Control
Housing, Regeneration and Development Department
Enfield Council
PO Box 53, Civic Centre
Silver Street, Enfield
EN1 3XE
If you have any questions about this decision, please contact the planning officer
Jeremiah.ayerh@enfield.gov.uk.
List of plans and documents referred to in this Notice:
Title/Number Version TYPE
GD2716/05 Drawing
GD2716/04A Drawing
GD2716/03 Drawing
GD2716/01 Drawing
GD2716/02 Rev B Drawing
Flood Risk Assessment Supporting Information
APPEAL
Should you (an applicant or agent) feel aggrieved by the decision of the Council to either refuse
permission or to grant permission subject to conditions, you can
Policies cited
National Planning Policy Framework 14SI12SI13CP21CP28DMD59DMD60DMD61NPPF
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.