Planning Atlas
Planning AtlasGreenwichBLACKHEATH WESTCOMBE wardSE3 0LG36 KIDBROOKE GROVE, KIDBROOKE, LONDON, SE3 0LG17/0285/F
Planning application · Greenwich

17/0285/F.

36 KIDBROOKE GROVE, KIDBROOKE, LONDON, SE3 0LG

Full / Other Planning at 36 KIDBROOKE GROVE, KIDBROOKE, LONDON, SE3 0LG, received 6 Feb 2017 — approved on 19 Jan 2018 by committee.

ApprovedRefusedOther
At a glance · this applicationGreenwich profile →
Approved
Outcome
19 Jan 2018
50 wks
Decision time
42 wks over the 8-week target
Conditions
not captured
55
Documents
55 linked
3
Objections
0 in support
No
Appeal
none recorded
Record from the Greenwich planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Demolition of existing outbuilding to the front and minor modification of the external elevation, excavation of basement including the formation of a light well, sunken courtyard, boundary treatments and installation of new wrought iron gate.

Reference
17/0285/F
Type
Full Planning Permission
Agent / consultant
Case officer
Postcode
Council
Received
6 Feb 2017
Target date
3 Apr 2017
Decision date
19 Jan 2018
Decision route
Planning committee
Status
Decided
Reference
17/0285/F
Type
Full Planning Permission
Show all 16 rows
Agent / consultant
Case officer
Postcode
Council
Received
6 Feb 2017
Target date
3 Apr 2017
Decision date
19 Jan 2018
Decision route
Planning committee
Status
Decided
Documents

What was filed?

Document
Published
View
Decision notice
20 Jan 2018
Site Notice
29 Nov 2017
(pl) 00 rev c
1 Nov 2017
Basement assessment rev b
1 Nov 2017
Construction method statement
1 Nov 2017
Drainage strategy
1 Nov 2017
Particle size distribution tests
1 Nov 2017
Preliminary structural calculations
1 Nov 2017
Site investigation document
1 Nov 2017
Specification for underpinning works
1 Nov 2017
Decision notice
20 Jan 2018
Site Notice
29 Nov 2017
(pl) 00 rev c
1 Nov 2017
Show all 10 rows
Basement assessment rev b
1 Nov 2017
Construction method statement
1 Nov 2017
Drainage strategy
1 Nov 2017
Particle size distribution tests
1 Nov 2017
Preliminary structural calculations
1 Nov 2017
Site investigation document
1 Nov 2017
Specification for underpinning works
1 Nov 2017

Documents open on the Greenwich portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Approved on 19 Jan 2018, determined by the planning committee — 50 weeks from submission (42 over the 8-week target).

Timeline

Date
Event
6 Feb 2017
Application received
3 Apr 2017
Statutory target date
19 Jan 2018
Committee decision: Approved
6 Feb 2017
Application received
3 Apr 2017
Statutory target date
19 Jan 2018
Committee decision: Approved

Public response

Measure
Count
Objections
3
In support
0
Total comments
3
Objections
3
In support
0
Total comments
3
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Determined at committee
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Show all 4 rows
Determined at committee
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.