25/4135/L.

Building 10, Station Way, Royal Arsenal Riverside, Woolwich

Listed Building at Building 10, Station Way, Royal Arsenal Riverside, Woolwich, received 9 Dec 2025 — approved on 16 Apr 2026 by committee.

ApprovedRefusedOther
At a glance · this applicationGreenwich profile →
Approved
Outcome
16 Apr 2026
18 wks
Decision time
10 wks over the 8-week target
Conditions
not captured
47
Documents
47 linked
0
Objections
0 in support
No
Appeal
none recorded
Record from the Greenwich planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

The proposed installation of Air Source Heat Pumps in the eastern portion of Building 10, specifically within the commercial floorspace in units 9 and 10, previously approved under planning permission 21/2056/L, with other associated works to the internal and external elements of the building, to support the decarbonisation of the existing energy centre as part of the overall strategy for Royal Arsenal Riverside.

Reference
25/4135/L
Type
Listed Building Consent
Applicant
Agent / consultant
Case officer
Council
Received
9 Dec 2025
Target date
3 Feb 2026
Decision date
16 Apr 2026
Decision route
Planning committee
Status
Decided
Reference
25/4135/L
Type
Listed Building Consent
Show all 14 rows
Applicant
Agent / consultant
Case officer
Council
Received
9 Dec 2025
Target date
3 Feb 2026
Decision date
16 Apr 2026
Decision route
Planning committee
Status
Decided
Documents

What was filed?

Document
Published
View
Published addendum - ref 254134f 254135l
16 Apr 2026
Published appendices - ref 254134f 254135l.
16 Apr 2026
Published main report - ref 254134f 254135l.
16 Apr 2026
Decision notice
16 Apr 2026
Correspondance
9 Jan 2026
Transport technical note
7 Jan 2026
Site location plan
10 Dec 2025
Design and access statement - part 2
10 Dec 2025
Energy centre, existing plan, level 01
10 Dec 2025
Site wide, proposed site plan, roof level
10 Dec 2025
Published addendum - ref 254134f 254135l
16 Apr 2026
Published appendices - ref 254134f 254135l.
16 Apr 2026
Published main report - ref 254134f 254135l.
16 Apr 2026
Show all 10 rows
Decision notice
16 Apr 2026
Correspondance
9 Jan 2026
Transport technical note
7 Jan 2026
Site location plan
10 Dec 2025
Design and access statement - part 2
10 Dec 2025
Energy centre, existing plan, level 01
10 Dec 2025
Site wide, proposed site plan, roof level
10 Dec 2025

Documents open on the Greenwich portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Approved on 16 Apr 2026, determined by the planning committee — 18 weeks from submission (10 over the 8-week target).

Timeline

Date
Event
9 Dec 2025
Application received
3 Feb 2026
Statutory target date
16 Apr 2026
Committee decision: Approved
9 Dec 2025
Application received
3 Feb 2026
Statutory target date
16 Apr 2026
Committee decision: Approved

Public response

Measure
Count
Objections
0
In support
0
Total comments
0
Objections
0
In support
0
Total comments
0
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Determined at committee
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Show all 4 rows
Determined at committee
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.