Planning Atlas
Planning AtlasGreenwichELTHAM TOWN & AVERY HILL ward26/0671/F
Planning application · Greenwich

26/0671/F.

ELTHAM GPO, 4 PASSEY PLACE, LONDON, SE9 5DQ

Full / Other Planning at ELTHAM GPO, 4 PASSEY PLACE, LONDON, SE9 5DQ, received 3 Mar 2026 — refused on 5 Jun 2026 (delegated, Brendan Meade).

GreenwichELTHAM TOWN & AVERY HILLSE9 5DQ26/0671/F
ApprovedRefusedOther
At a glance · this applicationGreenwich profile →
Refused
Outcome
5 Jun 2026
13 wks
Decision time
5 wks over the 8-week target
Conditions
not captured
32
Documents
32 linked
0
Objections
0 in support
No
Appeal
none recorded
Record from the Greenwich planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Construction of two-storey upward extension to facilitate the creation of seven (7) residential units (Use Class C3) together with internal cycle parking, refuse and recycling storage.

Reference
26/0671/F
Type
Full Planning Permission
Agent / consultant
Case officer
Postcode
SE9 5DQ
Council
Received
3 Mar 2026
Validated
9 Apr 2026
Target date
4 Jun 2026
Decision date
5 Jun 2026
Decision route
Delegated (officer)
Status
Decided
Reference
26/0671/F
Type
Full Planning Permission
Show all 16 rows
Agent / consultant
Case officer
Postcode
SE9 5DQ
Council
Received
3 Mar 2026
Validated
9 Apr 2026
Target date
4 Jun 2026
Decision date
5 Jun 2026
Decision route
Delegated (officer)
Status
Decided
Documents

What was filed?

Document
Published
View
Reports
5 Jun 2026
Decision notice
5 Jun 2026
Acknowledgement letter
13 Apr 2026
Proposed north elevation
8 Apr 2026
Proposed first floor
8 Apr 2026
Proposed west elevation
8 Apr 2026
Proposed south elevation
8 Apr 2026
Proposed site plan
8 Apr 2026
Proposed section
8 Apr 2026
Proposed section zz
8 Apr 2026
Reports
5 Jun 2026
Decision notice
5 Jun 2026
Acknowledgement letter
13 Apr 2026
Show all 10 rows
Proposed north elevation
8 Apr 2026
Proposed first floor
8 Apr 2026
Proposed west elevation
8 Apr 2026
Proposed south elevation
8 Apr 2026
Proposed site plan
8 Apr 2026
Proposed section
8 Apr 2026
Proposed section zz
8 Apr 2026

Documents open on the Greenwich portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Refused on 5 Jun 2026, delegated decision by Brendan Meade — 13 weeks from submission (5 over the 8-week target).

Timeline

Date
Event
3 Mar 2026
Application received
9 Apr 2026
Application validated
4 Jun 2026
Statutory target date
5 Jun 2026
Delegated decision: Refused · Brendan Meade
3 Mar 2026
Application received
9 Apr 2026
Application validated
4 Jun 2026
Statutory target date
Show all 4 rows
5 Jun 2026
Delegated decision: Refused · Brendan Meade

Why it was refused

Reason
As stated on the decision notice
1
By reason of the insufficient outlook, light and privacy provided for Flat 5, the insufficient outlook and light provided for Flat 3 and the insufficient outlook and light provided for Flat 2, the proposed development would fail to provide a suitable quality of accommodation for all future occupiers. Consequently, the proposed development would not be compliant with Policy D6 of the London Plan (2021), Policies H5 and DH1 of the Royal Greenwich Local Plan: Core Strategy with Detailed Policies (2014) and the Technical Housing Standards – Nationally Described Space Standard (2015), the London Housing SPG (2016).
2
The application submission fails to include section drawings going through the proposed development and the developments approved at nos. 2 and 4 Chequers Parade nor a Daylight/Sunlight Assessment on the light received by the approved front facing habitable room windows of these developments. Due to this insufficient information, officers raise concern on the impact that the development would have on the outlook, daylight and privacy afforded to the future occupiers of these units. As such, the development is not considered to be in accordance with Policy D3 of the London Plan (2021) and Policy DH(b) of the Royal Greenwich Local Plan: Core Strategy with Detailed Policies (2014) and the Urban Design SPD (2023).
3
The application submission fails to include section drawings going through the proposed development and the developments approved at no. 106 Eltham High Street nor a Daylight/Sunlight Assessment on the light received by the rear facing habitable room window and decking area of this development. Due to this insufficient information, officers raise concern on the impact that the development would have on the outlook and daylight afforded to the future occupiers of these units. As such, the development is not considered to be in accordance with Policy D3 of the London Plan (2021) and Policy DH(b) of the Royal Greenwich Local Plan: Core Strategy with Detailed Policies (2014) and the Urban Design SPD (2023).
1
By reason of the insufficient outlook, light and privacy provided for Flat 5, the insufficient outlook and light provided for Flat 3 and the insufficient outlook and light provided for Flat 2, the proposed development would fail to provide a suitable quality of accommodation for all future occupiers. Consequently, the proposed development would not be compliant with Policy D6 of the London Plan (2021), Policies H5 and DH1 of the Royal Greenwich Local Plan: Core Strategy with Detailed Policies (2014) and the Technical Housing Standards – Nationally Described Space Standard (2015), the London Housing SPG (2016).
2
The application submission fails to include section drawings going through the proposed development and the developments approved at nos. 2 and 4 Chequers Parade nor a Daylight/Sunlight Assessment on the light received by the approved front facing habitable room windows of these developments. Due to this insufficient information, officers raise concern on the impact that the development would have on the outlook, daylight and privacy afforded to the future occupiers of these units. As such, the development is not considered to be in accordance with Policy D3 of the London Plan (2021) and Policy DH(b) of the Royal Greenwich Local Plan: Core Strategy with Detailed Policies (2014) and the Urban Design SPD (2023).
3
The application submission fails to include section drawings going through the proposed development and the developments approved at no. 106 Eltham High Street nor a Daylight/Sunlight Assessment on the light received by the rear facing habitable room window and decking area of this development. Due to this insufficient information, officers raise concern on the impact that the development would have on the outlook and daylight afforded to the future occupiers of these units. As such, the development is not considered to be in accordance with Policy D3 of the London Plan (2021) and Policy DH(b) of the Royal Greenwich Local Plan: Core Strategy with Detailed Policies (2014) and the Urban Design SPD (2023).
Policies cited
D6H5DH1D3DH(b)

Public response

Measure
Count
Objections
0
In support
0
Total comments
1
Objections
0
In support
0
Total comments
1
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.