26/0689/F.
HOLY FAMILY RC PRIMARY SCHOOL, TUDWAY ROAD, LONDON, SE3 9YX
Full / Other Planning at HOLY FAMILY RC PRIMARY SCHOOL, TUDWAY ROAD, LONDON, SE3 9YX, received 4 Mar 2026 — approved on 1 Jun 2026 (delegated, Amelia Elliott).
What is it?
Alterations to the existing car park layout including widening the existing vehicular access onto Ryan Close and the uplift of existing car parking spaces; widening and reconstructing the adjacent highways and pedestrian footway; removal of existing concrete hardstanding; new cycle and electric vehicle charging spaces; removal of two semi-mature trees.
Show all 16 rows
What was filed?
Show all 10 rows
Documents open on the Greenwich portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗
What happened?
Approved on 1 Jun 2026, delegated decision by Amelia Elliott — 13 weeks from submission (5 over the 8-week target).
Timeline
Show all 4 rows
Public response
Who is involved?
What affects it?
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.