Planning Atlas
Planning AtlasHaringeyTottenham Central wardHGY/2024/0464
Planning application · Haringey

HGY/2024/0464.

College Of North East London Tottenham Centre High Road Tottenham London N15 4RU

Full / Other Planning at College Of North East London Tottenham Centre High Road Tottenham London N15 4RU — under consultation.

HaringeyTottenham CentralN15 4RUHGY/2024/0464
ApprovedRefusedOther
At a glance · this applicationHaringey profile →
Under Consultation
Outcome
no decision date
Decision time
submission → decision
Conditions
not captured
118
Documents
118 linked
3
Objections
0 in support
No
Appeal
none recorded
Record from the Haringey planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Demolition of the existing gym/lecture theatre block and the erection of a part four/part five-storey building (2,625 square metres GIA) to host a new Construction and Engineering Centre at the College.

Reference
HGY/2024/0464
Type
Full planning permission
Agent / consultant
Case officer
Postcode
N15 4RU
Council
Received
Validated
14 Mar 2024
Target date
19 Nov 2024
Decision date
Decision route
Planning committee
Status
Under Consultation
Reference
HGY/2024/0464
Type
Full planning permission
Show all 15 rows
Agent / consultant
Case officer
Postcode
N15 4RU
Council
Received
Validated
14 Mar 2024
Target date
19 Nov 2024
Decision date
Decision route
Planning committee
Status
Under Consultation
Documents

What was filed?

Document
Published
View
Noise Impact Assessment prepared by 24 Acoustics R9985-2 Rev
22 Feb 2024
Location/block/site plans, existing floor and demolition pla
13 Mar 2024
Geo-environmental and geotechnical assessment 1922791-01(00)
13 Mar 2024
Transport Statement by Ardent Consulting Engineers 2301780-R
13 Mar 2024
Proposed site, floor plans, external finishes plan
13 Mar 2024
Consultation response documents from London Fire Brigade
7 Oct 2024
5219901-ATK-01-00-D-A-021003 P1 DEN pipe route
7 Aug 2024
Appendix 6. Quality Review Panel report 17.01.24
30 Aug 2024
CCCG Tottenham Energy Assessment Report P 02 Feb 2024
22 Feb 2024
Microclimate Analysis prepared by AtkinsRealis P1 Volume 3 o
13 Mar 2024
Noise Impact Assessment prepared by 24 Acoustics R9985-2 Rev
22 Feb 2024
Location/block/site plans, existing floor and demolition pla
13 Mar 2024
Geo-environmental and geotechnical assessment 1922791-01(00)
13 Mar 2024
Show all 10 rows
Transport Statement by Ardent Consulting Engineers 2301780-R
13 Mar 2024
Proposed site, floor plans, external finishes plan
13 Mar 2024
Consultation response documents from London Fire Brigade
7 Oct 2024
5219901-ATK-01-00-D-A-021003 P1 DEN pipe route
7 Aug 2024
Appendix 6. Quality Review Panel report 17.01.24
30 Aug 2024
CCCG Tottenham Energy Assessment Report P 02 Feb 2024
22 Feb 2024
Microclimate Analysis prepared by AtkinsRealis P1 Volume 3 o
13 Mar 2024
Decision

What happened?

Status: Under Consultation. No decision is recorded yet.

Timeline

Date
Event
14 Mar 2024
Application validated
19 Nov 2024
Statutory target date
14 Mar 2024
Application validated
19 Nov 2024
Statutory target date

Public response

Measure
Count
Objections
3
In support
0
Total comments
11
Objections
3
In support
0
Total comments
11
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Determined at committee
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Show all 4 rows
Determined at committee
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.