P1343.18.
Upminster Underground Depot Front Lane Cranham Upminster RM14 1XL
Full / Other Planning at Upminster Underground Depot Front Lane Cranham Upminster RM14 1XL, received 4 Sep 2018 — approved on 2 Nov 2018 (delegated, Cole Hodder).
What is it?
The installation of 4 No. transmission dishes on an existing lighting tower. installation of an equipment cabinet at ground level. The removal of lighting headframe. Floodlights to be removed and new upgraded versions to be installed lower on tower
Show all 16 rows
What was filed?
No documents are recorded for this application.
Documents open on the Havering portal. View the application page ↗
What happened?
Approved on 2 Nov 2018, delegated decision by Cole Hodder — 8 weeks from submission.
Timeline
Show all 4 rows
Public response
Comment counts were not captured for this application.
Who is involved?
What affects it?
Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.
Other applications within 250 metres (context — nearby, not this application)
No other geocoded decision is recorded within 250 metres.