20/04481/FUL.

1 -�9 Southville London SW8 2PR

Full / Other Planning at 1 -�9 Southville London SW8 2PR, received 23 Dec 2020 — approved on 31 Mar 2023 by committee.

LambethStockwell West & LarkhallSW8 2PR20/04481/FUL
ApprovedRefusedOther
At a glance · this applicationLambeth profile →
Approved
Outcome
31 Mar 2023
118 wks
Decision time
110 wks over the 8-week target
Conditions
not captured
74
Documents
74 linked
0
Objections
1 in support
No
Appeal
none recorded
Record from the Lambeth planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Demolition of existing buildings and erection of 3 storey building plus setback roof level to provide a 297sqm floorspace of commercial unit (Use Class E) at ground floor level and 14 residential units (Use Class C3) at first, second and third floor levels comprising 2 x studio, 4 x 1 bed, 6 x 2 bed and 2 x 3 bed units, together with the provision of bin and cycle storage.

Reference
20/04481/FUL
Type
Full Planning Permission
Applicant
Agent / consultant
Case officer
Postcode
SW8 2PR
Council
Received
23 Dec 2020
Validated
21 Jan 2021
Target date
31 Mar 2023
Decision date
31 Mar 2023
Decision route
Planning committee
Status
Decided
Reference
20/04481/FUL
Type
Full Planning Permission
Show all 16 rows
Applicant
Agent / consultant
Case officer
Postcode
SW8 2PR
Council
Received
23 Dec 2020
Validated
21 Jan 2021
Target date
31 Mar 2023
Decision date
31 Mar 2023
Decision route
Planning committee
Status
Decided
Documents

What was filed?

Document
Published
View
Decision Notice
31 Mar 2023
REVISED DRAWINGS FINAL
12 Sept 2022
DRAWING SCHEDULE
12 Sept 2022
CONTEXTUAL ELEVATIONS
6 Sept 2022
GLA ENERGY SPREADSHEET
1 Sept 2022
FIRST FLOOR PLANTING PLAN
1 Sept 2022
ROOF LEVEL PLANTING PLAN
1 Sept 2022
UGF PLAN
1 Sept 2022
ACCOMMODATION SCHEDULE
1 Sept 2022
SOLAR PV BAUDER TECHNICAL SPECIFICATION
1 Sept 2022
Decision Notice
31 Mar 2023
REVISED DRAWINGS FINAL
12 Sept 2022
DRAWING SCHEDULE
12 Sept 2022
Show all 10 rows
CONTEXTUAL ELEVATIONS
6 Sept 2022
GLA ENERGY SPREADSHEET
1 Sept 2022
FIRST FLOOR PLANTING PLAN
1 Sept 2022
ROOF LEVEL PLANTING PLAN
1 Sept 2022
UGF PLAN
1 Sept 2022
ACCOMMODATION SCHEDULE
1 Sept 2022
SOLAR PV BAUDER TECHNICAL SPECIFICATION
1 Sept 2022

Documents open on the Lambeth portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Approved on 31 Mar 2023, determined by the planning committee — 118 weeks from submission (110 over the 8-week target).

Timeline

Date
Event
23 Dec 2020
Application received
21 Jan 2021
Application validated
31 Mar 2023
Statutory target date
31 Mar 2023
Committee decision: Approved
23 Dec 2020
Application received
21 Jan 2021
Application validated
31 Mar 2023
Statutory target date
Show all 4 rows
31 Mar 2023
Committee decision: Approved

Public response

Measure
Count
Objections
0
In support
1
Total comments
1
Objections
0
In support
1
Total comments
1
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Determined at committee
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Show all 4 rows
Determined at committee
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.