Planning Atlas
Planning AtlasLambethWaterloo & South Bank ward21/01869/FUL
Planning application · Lambeth

21/01869/FUL.

Evelina Children's Hospital St Thomas' Hospital 249 Westminster Bridge Road London SE1 7EH

Full / Other Planning at Evelina Children's Hospital St Thomas' Hospital 249 Westminster Bridge Road London SE1 7EH, received 26 Apr 2021 — approved on 11 Sep 2024 by committee.

LambethWaterloo & South BankSE1 7EH21/01869/FUL
ApprovedRefusedOther
At a glance · this applicationLambeth profile →
Approved
Outcome
11 Sep 2024
176 wks
Decision time
168 wks over the 8-week target
Conditions
not captured
106
Documents
106 linked
1
Objections
50 in support
No
Appeal
none recorded
Record from the Lambeth planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Demolition of existing St Thomas' House and Dunhill Fitness Centre and development of a 12 storey building (G+11) plus two storey basement with five storey link extension to the Evelina London Children's Hospital to provide additional children's medical services (Class C2), hard and soft landscaping, access and associated works. This application is a DEPARTURE APPLICATION: The proposed development is a departure from Policy Q26 of the Lambeth Local Plan (2015).

Reference
21/01869/FUL
Type
Full Planning Permission
Agent / consultant
Case officer
Postcode
SE1 7EH
Council
Received
26 Apr 2021
Target date
11 Sep 2024
Decision date
11 Sep 2024
Decision route
Planning committee
Status
Decided
Reference
21/01869/FUL
Type
Full Planning Permission
Show all 15 rows
Agent / consultant
Case officer
Postcode
SE1 7EH
Council
Received
26 Apr 2021
Target date
11 Sep 2024
Decision date
11 Sep 2024
Decision route
Planning committee
Status
Decided
Documents

What was filed?

Document
Published
View
Decision Notice
11 Sept 2024
BREEAM PRE-ASSESSMENT
6 Aug 2021
RESPONSE TO DLSL COMMENTS
4 Aug 2021
DETAILED CIRCULAR ECONOMY STATEMENT
25 May 2021
WHOLE LIFE CARBON ASSESSMENT REPORT
25 May 2021
PART 1
13 May 2021
PART 2
13 May 2021
DRAINAGE STRATEGY
13 May 2021
LEVEL 00 - GA PLAN
13 May 2021
LEVEL 01 - GA PLAN
13 May 2021
Decision Notice
11 Sept 2024
BREEAM PRE-ASSESSMENT
6 Aug 2021
RESPONSE TO DLSL COMMENTS
4 Aug 2021
Show all 10 rows
DETAILED CIRCULAR ECONOMY STATEMENT
25 May 2021
WHOLE LIFE CARBON ASSESSMENT REPORT
25 May 2021
PART 1
13 May 2021
PART 2
13 May 2021
DRAINAGE STRATEGY
13 May 2021
LEVEL 00 - GA PLAN
13 May 2021
LEVEL 01 - GA PLAN
13 May 2021

Documents open on the Lambeth portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Approved on 11 Sep 2024, determined by the planning committee — 176 weeks from submission (168 over the 8-week target).

Timeline

Date
Event
26 Apr 2021
Application received
11 Sep 2024
Statutory target date
11 Sep 2024
Committee decision: Approved
26 Apr 2021
Application received
11 Sep 2024
Statutory target date
11 Sep 2024
Committee decision: Approved

Public response

Measure
Count
Objections
1
In support
50
Total comments
51
Objections
1
In support
50
Total comments
51
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Determined at committee
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer (report to committee)
Show all 4 rows
Determined at committee
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.