Planning Atlas
Planning AtlasLambethWaterloo & South Bank ward25/01179/FUL
Planning application · Lambeth

25/01179/FUL.

249 St Thomas' Hospital, Fifth Floor Lambeth Wing Westminster Bridge Road London Lambeth SE1 7EH

Full / Other Planning at 249 St Thomas' Hospital, Fifth Floor Lambeth Wing Westminster Bridge Road London Lambeth SE1 7EH, received 11 Apr 2025 — approved on 8 Jul 2025 (delegated, Rowena Folkes).

LambethWaterloo & South BankSE1 7EH25/01179/FUL
ApprovedRefusedOther
At a glance · this applicationLambeth profile →
Approved
Outcome
8 Jul 2025
13 wks
Decision time
5 wks over the 8-week target
Conditions
not captured
18
Documents
18 linked
0
Objections
0 in support
No
Appeal
none recorded
Record from the Lambeth planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Provision of a new Air Handling Unit in the roof terrace of Lambeth Wing, St Thomas' Hospital with vertical drops to the required floor.

Reference
25/01179/FUL
Type
Full Planning Permission
Agent / consultant
Case officer
Postcode
SE1 7EH
Council
Received
11 Apr 2025
Target date
9 Jul 2025
Decision date
8 Jul 2025
Decision route
Delegated (officer)
Status
Decided
Reference
25/01179/FUL
Type
Full Planning Permission
Show all 15 rows
Agent / consultant
Case officer
Postcode
SE1 7EH
Council
Received
11 Apr 2025
Target date
9 Jul 2025
Decision date
8 Jul 2025
Decision route
Delegated (officer)
Status
Decided
Documents

What was filed?

Document
Published
View
OFFICER'S REPORT
8 Jul 2025
PROPOSED ROOF PLAN
9 Jun 2025
PROPOSED ELEVATIONS
9 Jun 2025
Plans - Revised
9 Jun 2025
THE LOCATION PLAN
11 Apr 2025
ELEVATION (FRONT) - EXISTING
11 Apr 2025
DUCKWORK PLAN & ELEVATION DETAILS
11 Apr 2025
DESIGN AND ACCESS STATEMENT
11 Apr 2025
ELEVATION (SIDE) - EXISTING
11 Apr 2025
DUCTWORK SECTION DETAIL
11 Apr 2025
OFFICER'S REPORT
8 Jul 2025
PROPOSED ROOF PLAN
9 Jun 2025
PROPOSED ELEVATIONS
9 Jun 2025
Show all 10 rows
Plans - Revised
9 Jun 2025
THE LOCATION PLAN
11 Apr 2025
ELEVATION (FRONT) - EXISTING
11 Apr 2025
DUCKWORK PLAN & ELEVATION DETAILS
11 Apr 2025
DESIGN AND ACCESS STATEMENT
11 Apr 2025
ELEVATION (SIDE) - EXISTING
11 Apr 2025
DUCTWORK SECTION DETAIL
11 Apr 2025

Documents open on the Lambeth portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Approved on 8 Jul 2025, delegated decision by Rowena Folkes — 13 weeks from submission (5 over the 8-week target).

Timeline

Date
Event
11 Apr 2025
Application received
9 Jul 2025
Statutory target date
8 Jul 2025
Delegated decision: Approved · Rowena Folkes
11 Apr 2025
Application received
9 Jul 2025
Statutory target date
8 Jul 2025
Delegated decision: Approved · Rowena Folkes

Public response

Measure
Count
Objections
0
In support
0
Total comments
0
Objections
0
In support
0
Total comments
0
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.