Planning Atlas
Planning AtlasLewishamNew Cross Gate wardSE14 5DSDC/23/134251
Planning application · Lewisham

DC/23/134251.

FLAT A, CHRISTOPHER COURT, 7 NEW CROSS ROAD, LONDON, SE14 5DS

Listed Building at FLAT A, CHRISTOPHER COURT, 7 NEW CROSS ROAD, LONDON, SE14 5DS, received 18 Dec 2023 — withdrawn on 5 Mar 2024 (delegated, Barnaby Garcia).

LewishamNew Cross GateSE14 5DSDC/23/134251
ApprovedRefusedOther
At a glance · this applicationLewisham profile →
Withdrawn
Outcome
5 Mar 2024
11 wks
Decision time
3 wks over the 8-week target
Conditions
not captured
15
Documents
15 linked
0
Objections
0 in support
No
Appeal
none recorded
Record from the Lewisham planning register as captured; documents link to the council's own files. Nearby applications are context, not part of this application.
Application

What is it?

Listed Building Consent for the construction of an extension to the rear of Flat A Christopher Court, 7 New Cross Road SE14.

Reference
DC/23/134251
Type
Listed Building Consent
Agent / consultant
Case officer
Postcode
Council
Received
18 Dec 2023
Validated
22 Jan 2024
Target date
18 Mar 2024
Decision date
5 Mar 2024
Decision route
Delegated (officer)
Reference
DC/23/134251
Type
Listed Building Consent
Show all 15 rows
Agent / consultant
Case officer
Postcode
Council
Received
18 Dec 2023
Validated
22 Jan 2024
Target date
18 Mar 2024
Decision date
5 Mar 2024
Decision route
Delegated (officer)
Documents

What was filed?

Document
Published
View
Flood risk form
12 Jan 2024
Flood risk assessment and mitigation measures.
12 Jan 2024
Existing general arrangements demolition plan
12 Jan 2024
Existing general arrangements
12 Jan 2024
Proposed general arrangements
12 Jan 2024
Proposed elevation details
12 Jan 2024
Proposed roof structure drainage plan
12 Jan 2024
Proposed roof structure indicative detail
12 Jan 2024
Site location plan
18 Dec 2023
Proposed block plan
18 Dec 2023
Flood risk form
12 Jan 2024
Flood risk assessment and mitigation measures.
12 Jan 2024
Existing general arrangements demolition plan
12 Jan 2024
Show all 10 rows
Existing general arrangements
12 Jan 2024
Proposed general arrangements
12 Jan 2024
Proposed elevation details
12 Jan 2024
Proposed roof structure drainage plan
12 Jan 2024
Proposed roof structure indicative detail
12 Jan 2024
Site location plan
18 Dec 2023
Proposed block plan
18 Dec 2023

Documents open on the Lewisham portal (the portal needs its documents tab opened first — the link handles that). View the application page ↗

Decision

What happened?

Withdrawn on 5 Mar 2024, delegated decision by Barnaby Garcia — 11 weeks from submission (3 over the 8-week target).

Timeline

Date
Event
18 Dec 2023
Application received
22 Jan 2024
Application validated
18 Mar 2024
Statutory target date
5 Mar 2024
Delegated decision: Withdrawn · Barnaby Garcia
18 Dec 2023
Application received
22 Jan 2024
Application validated
18 Mar 2024
Statutory target date
Show all 4 rows
5 Mar 2024
Delegated decision: Withdrawn · Barnaby Garcia

Public response

Measure
Count
Objections
0
In support
0
Total comments
0
Objections
0
In support
0
Total comments
0
People

Who is involved?

Name
Role
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Applicant — the party who applied, not necessarily the owner
Agent · consultant profile
Case officer — delegated decision
Place

What affects it?

Context around the site — not part of this application. Designations over the site: use the map's designations filter (conservation areas, listed buildings, Article 4, flood risk …). Decisions within 250 metres of the site are listed below — context, not this application.

Other applications within 250 metres (context — nearby, not this application)

No other geocoded decision is recorded within 250 metres.