competent person:GASAFE · Install an unvented hot water storage vessel · received 20 Apr 2026 · Kirkman and Jourdain Limited · GASAFE
Replacement of sterile services washers and autoclaves and associated mechanical and electrical enabling works BSR Reference: BCA07569W3M9 - LDSA Hub Reference: BSR25/0564 · received 18 Aug 2025
Fitout of floors 2- 4 and new MEP services, including installation on new high pressure misting system to those floors · received 7 Aug 2025
Replace existing fire doors and frame with infill studwork above with fireline boarding and quilt with plaster finish to door reference ST0404282 & ST 0404100 which are a single door and double door set. Doors are fire rated and have vison panels, intumescent/smoke seals and fire rated ironmongery. BSR Reference: BCA06849G3F2 LDSA Hub Reference: BSR25/0465 Replace existing fire doors and frame with infill studwork above with fireline boarding and quilt with plaster finish to door reference ST0404282 & ST 0404100 which are a single door and double door set. Doors are fire rated and have vison panels, intumescent/smoke seals and fire rated ironmongery. · received 7 Jul 2025
BSR Reference: BCA06896W3F9. LDSA Hub Reference: BSR25/0445. Maternity Assessment Unit, 7th Floor, North Wing, SE1 7EH. The works proposed are the internal refurbishment of the existing Maternity Assessment Unit MAU on the 7th floor of the North Wing at St Thomas Hospital designed to meet HTM standards. · received 24 Jun 2025
Internal alterations to sub-divide the changing room and create a new office, rest room and lobby. As well as newly created shower facilities on the 1st floor of the existing Portakabin units Mortuary Office, · received 5 Jun 2025
Alterations & refurbishment works to the 7th Floor to convert an anaesthetic room, nurse base & office. Relocating a door on a WC and relocating a pneumatic tube point. · received 29 Sept 2023 · Withdrawn
The refurbishment and minor alteration of an MRI suite within Rayne Department. · received 26 Sept 2023 · Accepted
Fire Compliance Improvement Works East Wing. Fire door, fire stopping and fire compartmentation improvement works from Basement to 11th Floor of East Wing at St. Thomas Hospital. · received 25 Sept 2023 · Accepted
PET Scanner replacement works to first floor of Lambeth Wing @ St. Thomas Hospital, PET Centre, 1st Floor Lambeth Wing Westminster Bridge Road · received 22 Sept 2023 · Accepted
competent person:GASAFE · Install an unvented hot water storage vessel · received 20 Apr 2026 · Kirkman and Jourdain Limited · GASAFE
Replacement of sterile services washers and autoclaves and associated mechanical and electrical enabling works BSR Reference: BCA07569W3M9 - LDSA Hub Reference: BSR25/0564 · received 18 Aug 2025
Fitout of floors 2- 4 and new MEP services, including installation on new high pressure misting system to those floors · received 7 Aug 2025
Show all 10 rows
Replace existing fire doors and frame with infill studwork above with fireline boarding and quilt with plaster finish to door reference ST0404282 & ST 0404100 which are a single door and double door set. Doors are fire rated and have vison panels, intumescent/smoke seals and fire rated ironmongery. BSR Reference: BCA06849G3F2 LDSA Hub Reference: BSR25/0465 Replace existing fire doors and frame with infill studwork above with fireline boarding and quilt with plaster finish to door reference ST0404282 & ST 0404100 which are a single door and double door set. Doors are fire rated and have vison panels, intumescent/smoke seals and fire rated ironmongery. · received 7 Jul 2025
BSR Reference: BCA06896W3F9. LDSA Hub Reference: BSR25/0445. Maternity Assessment Unit, 7th Floor, North Wing, SE1 7EH. The works proposed are the internal refurbishment of the existing Maternity Assessment Unit MAU on the 7th floor of the North Wing at St Thomas Hospital designed to meet HTM standards. · received 24 Jun 2025
Internal alterations to sub-divide the changing room and create a new office, rest room and lobby. As well as newly created shower facilities on the 1st floor of the existing Portakabin units Mortuary Office, · received 5 Jun 2025
Alterations & refurbishment works to the 7th Floor to convert an anaesthetic room, nurse base & office. Relocating a door on a WC and relocating a pneumatic tube point. · received 29 Sept 2023 · Withdrawn
The refurbishment and minor alteration of an MRI suite within Rayne Department. · received 26 Sept 2023 · Accepted
Fire Compliance Improvement Works East Wing. Fire door, fire stopping and fire compartmentation improvement works from Basement to 11th Floor of East Wing at St. Thomas Hospital. · received 25 Sept 2023 · Accepted
PET Scanner replacement works to first floor of Lambeth Wing @ St. Thomas Hospital, PET Centre, 1st Floor Lambeth Wing Westminster Bridge Road · received 22 Sept 2023 · Accepted