Planning Atlas
AtlasPostcodeSW90FS
Dev
Session
Tier
Planning AtlasLambethBrixton North wardSW9 0FS
Postcode record · Lambeth

SW9 0FS.

SW9 0FS has 51 known premises and 0 planning records. 24 EPC records.

Postcode SW9 0FS · boundary not held, centred on the postcode
At a glance · this postcodeLambeth profile →
51
Premises
known addresses (UPRNs)
0
Applications
none decided
Approval rate
no decided records
24
EPC records
ratings B 24
0
Mapped applications
inside the postcode shape
Postcode unit boundary from Ordnance Survey; premises and applications inside it. Aggregates describe the area, not any single premises.
Property

What is it?

SW9 0FS has 51 known premises and 0 planning records. 24 EPC records.

Premises (18 of 51 shown)

Planning

What happened?

No planning application is linked to premises in this postcode yet.

Building control

Building-control applications and notices in this postcode, from the council register.

Name
Details
REPLACEMENT OF EXISTING FIRE DOORS TO PLANT AND STORE ROOMS WITH NEW FD30 / FD60 DOOR . · received 19 Dec 2023 · Withdrawn
competent person:NAPIT · Install a photovoltaic system · received 24 Jun 2020 · The Eco Team Ltd · NAPIT
competent person:NICEIC · New full electrical installation (new build) · received 24 May 2020 · Roman Electrical Limited · NICEIC
competent person:NICEIC · New full electrical installation (new build) · received 24 May 2020 · Roman Electrical Limited · NICEIC
competent person:NICEIC · New full electrical installation (new build) · received 24 May 2020 · NICEIC
competent person:NICEIC · New full electrical installation (new build) · received 24 May 2020 · Roman Electrical Limited · NICEIC
competent person:NICEIC · New full electrical installation (new build) · received 17 May 2020 · NICEIC
competent person:NICEIC · New full electrical installation (new build) · received 17 May 2020 · NICEIC
competent person:NICEIC · New full electrical installation (new build) · received 17 May 2020 · Roman Electrical Limited · NICEIC
competent person:NICEIC · New full electrical installation (new build) · received 17 May 2020 · Roman Electrical Limited · NICEIC
REPLACEMENT OF EXISTING FIRE DOORS TO PLANT AND STORE ROOMS WITH NEW FD30 / FD60 DOOR . · received 19 Dec 2023 · Withdrawn
competent person:NAPIT · Install a photovoltaic system · received 24 Jun 2020 · The Eco Team Ltd · NAPIT
competent person:NICEIC · New full electrical installation (new build) · received 24 May 2020 · Roman Electrical Limited · NICEIC
Show all 10 rows
competent person:NICEIC · New full electrical installation (new build) · received 24 May 2020 · Roman Electrical Limited · NICEIC
competent person:NICEIC · New full electrical installation (new build) · received 24 May 2020 · NICEIC
competent person:NICEIC · New full electrical installation (new build) · received 24 May 2020 · Roman Electrical Limited · NICEIC
competent person:NICEIC · New full electrical installation (new build) · received 17 May 2020 · NICEIC
competent person:NICEIC · New full electrical installation (new build) · received 17 May 2020 · NICEIC
competent person:NICEIC · New full electrical installation (new build) · received 17 May 2020 · Roman Electrical Limited · NICEIC
competent person:NICEIC · New full electrical installation (new build) · received 17 May 2020 · Roman Electrical Limited · NICEIC
Place

What affects it?

No mapped designation intersects a premises point in this postcode in the current build. Open any premises above for its own designation record.

People

Who is involved?

Applicants, agents and officers are attached per application; the current area build carries references only — the borough entity run adds the names here.

Development

What could it become?

Planning precedent0 applications and 0 mapped decisions in this postcode — precedent for what has been permitted and refused here.
Energy24 EPC records; ratings B: 24.
What is not assertedNo capacity, value or ownership claim is made at area level; those belong to individual premises records and their evidence.

Intent signals

Planning Atlas Pro

Ownership, finance and market signals recorded at addresses in this postcode — each with date and source. Signals are evidence of change, not a prediction.

2 intent signals recorded in this postcode
Price decline
Subscribe to see the signals →
Boundary: OS Postcode Unit areas (Ordnance Survey), 2026-08-14. Planning records: canonical stage2. EPC: EPC register. Premises: OS AddressBase / UPRN.