Non-material amendment sought for approved planning applicaiton 2899/17: The approved plan illustrates a 7 panel bay window on both ground and first floor side extension. I would like to change this to a 5 panel bay window, with the same radius and circumference. The size of the bay window on both ground and first floors will not change, the change is only to reduce the number of panels to the bay window. (Summary)
Non-material amendment sought for approved planning applicaiton 2899/17: The approved plan illustrates a 7 panel bay window on both ground and first floor side extension. I would like to change this to a 5 panel bay window, with the same radius and circumference. The size of the bay window on both ground and first floors will not change, the change is only to reduce the number of panels to the bay window. (Summary)
Building-control records are not yet collected for Redbridge — the register is being gathered borough by borough (held so far: Lambeth, Brent, Ealing, Westminster, City and others).
Place
What affects it?
Every mapped designation touching a premises in this postcode, with how many of its 24 premises each one covers.
Designation
Coverage
Archaeological Priority Area
Summary and Definition The Archaeological Priority Area covers the course of the river Roding and areas of adjacent open ground. The APA has been classified as Tier 3 because it is deemed to have archaeological potential for · reference 78413 · covers 24 of 24 premises. Groundworks may require archaeological assessment or investigation.
Archaeological Priority Area
Summary and Definition The Archaeological Priority Area covers the course of the river Roding and areas of adjacent open ground. The APA has been classified as Tier 3 because it is deemed to have archaeological potential for · reference 78413 · covers 24 of 24 premises. Groundworks may require archaeological assessment or investigation.
Nearby postcodes and streets
Walk to the next area — linked where the Atlas has a record for it (pilot borough only for now).
Planning precedent45 applications and 45 mapped decisions in this postcode — precedent for what has been permitted and refused here.
Energy8 EPC records; ratings D: 3, E: 2, F: 3.
What is not assertedNo capacity, value or ownership claim is made at area level; those belong to individual premises records and their evidence.
Intent signals
Planning Atlas Pro
Ownership, finance and market signals recorded at addresses in this postcode — each with date and source. Signals are evidence of change, not a prediction.
Boundary: OS Postcode Unit areas (Ordnance Survey), 2026-08-14. Planning records: canonical stage2. EPC: EPC register. Premises: OS AddressBase / UPRN.
IG4 5JP, Redbridge: planning and property history | Planning Atlas