Hammersmith And Fulham · Viability

What development costs here.

Hammersmith And Fulham charges £604/m² residential CIL in its top zone — 4th of 33 London boroughs; a consent here carries 7.8 conditions on average and takes 11 weeks to decide (4th slowest of 32). We hold 242 of its s106 agreements and 44 viability assessments — the deeds and the numbers, not a rate table.

  • CIL: highest Kensington And Chelsea £1,132/m², lowest Bexley £91/m² · Hammersmith And Fulham £604/m².
  • Conditions: heaviest Hillingdon 7.9, lightest Westminster 3.3 per consent · Hammersmith And Fulham 7.8.
  • Decision time: slowest Camden 15 wks, fastest Barking And Dagenham 8 wks · Hammersmith And Fulham 11 wks.
  • s106 per agreement (deeds read so far, ≥10 per borough): highest Croydon £700k median, lowest Kingston Upon Thames £950.
4 CIL zones242 s106 agreements44 viability assessmentsSearch this borough →
Wards shaded by matching applications · click one to open it
At a glance · what it costs · Hammersmith And Fulham vs London
£604/m²
CIL · residential
top zone · 4 zones · 4th highest of 33
7.8
Conditions per consent
26 consents read · too few read to rank
11 wks
Decision time
median, 11,467 decisions · 4th slowest of 32
242
s106 agreements on file
25 read · 5 with a £ total
44
Viability assessments on file
3 read · 3 say unviable
Community Infrastructure Levy · Hammersmith And Fulham

The borough's charging schedule by zone and use, indexed where the council publishes an indexed figure, plus Mayoral CIL. Source: the council's CIL page.

Zone
Use
Borough CIL
Mayoral CIL
Verified
Central A
residential
£302/m²
£80/m² (Band 1)
2026-04-20
Central B
residential
£121/m²
£80/m² (Band 1)
2026-04-20
North
residential
£151/m²
£80/m² (Band 1)
2026-04-20
South
residential
£604/m²
£80/m² (Band 1)
2026-04-20
Central A
residential
£302/m²
£80/m² (Band 1)
2026-04-20
Central B
residential
£121/m²
£80/m² (Band 1)
2026-04-20
North
residential
£151/m²
£80/m² (Band 1)
2026-04-20
Show all 4 rows
South
residential
£604/m²
£80/m² (Band 1)
2026-04-20
Conditions by type and year is subscriber dataSubscribe to see it →
The wait after committee · committee said yes → decision notice issued
197.5
median days · with a s106
44 approvals · p75 288
2
median days · no s106
82 approvals
158
London median · with a s106
1,029 approvals, 33 boroughs

A resolution to grant is not a permission: where a section 106 has to be signed the notice waits for the deed. In Hammersmith And Fulham that wait has a median of 197.5 days with a s106 against 2 without — carried as finance and cost-inflation risk after the politics is done. From 126 committee approvals matched to their decision record.

Longest waits here · committee date → decision notice
2020/01455/VARVariation of the wording of condition 33 of planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two581ds106
2021/03898/FULDemolition of all existing buildings and structures; provision of new buildings ranging from 5 to 17 storeys in height comprising: safeguard561d
2022/02745/FULDemolition of existing autos workshop building (Use Class B2) and erection of a part one, part two storey plus-basement building with a comm518ds106

Committee minutes matched to the canonical record by reference; lag = decision date − committee date for approved items; "with a s106" = deed on file or a legal agreement cited in the decision. Where the council dates the decision at the committee itself, the true wait is longer than shown. London-wide comparison on What You Pay to Build.

What s106 costs here is subscriber dataSubscribe to see it →
What the deeds obligate here · 25 agreements read

Every obligation in the Hammersmith And Fulham agreements we have read, grouped by what it is for — the money by type where a sum is stated, and how often each type appears at all (most obligations are unpriced: build this, provide that).

Highways & road safety: £··· (34%)Cycle provision: £··· (31%)Affordable housing: £··· (27%)Public realm: £··· (4%)Employment & training: £··· (2%)Carbon offset & energy: £··· (2%)Other: £··· (1%)Trees & ecology: £··· (0%)£···priced obligations
  • Highways & road safety£···6 deeds
  • Cycle provision£···3 deeds
  • Affordable housing£···9 deeds
  • Public realm£···3 deeds
  • Employment & training£···2 deeds
  • Carbon offset & energy£···3 deeds
  • Other£···10 deeds
  • Trees & ecology£···2 deeds
How often each obligation appears · Hammersmith And Fulham vs London
Other
40% · London 40%most: Brent 77%
Affordable housing
36% · London 29%most: Southwark 69%
Highways & road safety
24% · London 28%most: Tower 62%
Monitoring & legal fees
12% · London 47%most: Merton 82%
Construction management
12% · London 21%most: Barnet 61%
Public realm
12% · London 4%highest in London
Cycle provision
12% · London 17%most: Barnet 58%
Carbon offset & energy
12% · London 25%most: Greenwich 67%
Travel plan
8% · London 12%most: Greenwich 39%
Employment & training
8% · London 14%most: Greenwich 39%

Red tick = London share across every deed read (2,311).

What you may be asked to pay for · Hammersmith And Fulham
  • Highways & road safety · in 5 of 25 deeds · typically £···
    Community Infrastructure Levy (CIL) liability for planning permission 2024/02447/NMAT, site address Mews Garages Rear Of
  • Other · in 2 of 25 deeds · typically £···
    Late Payment Interest charged due to superseded application 2019/02605/FUL.
  • Public realm · in 2 of 25 deeds · typically £···
    public realm and public safety
  • Cycle provision · in 2 of 25 deeds · typically £···
    contribute £2,000 towards the cost of the cycle store and associated facilities
  • Carbon offset & energy · in 2 of 25 deeds · typically £···
    Carbon Offset Contribution
  • Affordable housing · in 1 of 25 deeds · typically £···
    contribute £3,000 towards the cost of the affordable housing units
  • Employment & training · in 1 of 25 deeds · typically £···
    Employment and Training Contribution
  • Trees & ecology · in 1 of 25 deeds · typically £···
    Tree Maintenance Contribution
What you will be asked to provide or do · no price on it
  • Affordable housing · in 9 of 25 deeds (36%)
    35% affordable homes at the Site
  • Other · in 8 of 25 deeds (32%)
    short
  • Highways & road safety · in 3 of 25 deeds (12%)
    Highway works in accordance with Planning Permission and Section 278 of Highways Act 1980 as shown on Plan 2
  • Monitoring & legal fees · in 3 of 25 deeds (12%)
    Multi-modal travel survey monitoring and reporting costs
  • Construction management · in 3 of 25 deeds (12%)
    Obligations relating to compliance with and performance of covenants as set out in Schedules 1-4
  • Cycle provision · in 2 of 25 deeds (8%)
    provide a cycle store and associated facilities
  • Carbon offset & energy · in 2 of 25 deeds (8%)
    The Developer will provide a minimum of 10% of the total floor space as car club bays.
  • Travel plan · in 2 of 25 deeds (8%)
    Workplace Travel Plan for 14-16 Peterborough Road development including Travel Plan Coordinator, multi-modal travel surv

These carry no sum in the deed but cost time, design and management to deliver — the hidden cost of consent here.

Thresholds by scheme size is subscriber dataSubscribe to see it →
On file · Hammersmith And Fulham

Every s106 agreement we hold for Hammersmith And Fulham, newest first, linked to its application (the document itself is on the application page). “Unread” = on file, terms not yet extracted.

Application
Site · proposal
Year
s106 total
Obligations
33 - 35 Dawes Road London SW6 7DT · Erection of rear roof extensions; erection of rear extensions at second floor level, on top of the existing back additions; excavation of front part of the exis
2025
unread
unread
Fulham Gas Works Imperial Road London · Deed of Variation to paragraphs 2.10, 2.11, 2.12 and 2.13 of Schedule 12 of the Section 106 Agreement attached to planning permission (ref: 2018/02100/COMB) dat
2025
2 · Affordable housing
Fulham Gas Works Imperial Road London · Deed of Variation to paragraphs 2.10, 2.11, 2.12 and 2.13 of Schedule 12 of the Section 106 Agreement attached to planning permission (ref: 2018/02100/COMB) dat
2025
2 · Affordable housing
33 - 35 Dawes Road London SW6 7DT · Erection of rear roof extensions; erection of rear extensions at second floor level, on top of the existing back additions; excavation of front part of the exis
2025
unread
unread
Fulham Gas Works Imperial Road London · Deed of Variation to paragraphs 2.10, 2.11, 2.12 and 2.13 of Schedule 12 of the Section 106 Agreement attached to planning permission (ref: 2018/02100/COMB) dat
2025
2 · Affordable housing
Fulham Gas Works Imperial Road London · Deed of Variation to paragraphs 2.10, 2.11, 2.12 and 2.13 of Schedule 12 of the Section 106 Agreement attached to planning permission (ref: 2018/02100/COMB) dat
2025
2 · Affordable housing
Showing 3 of 242 · the full list with the documents is subscriber dataSubscribe to see them →

Showing the newest 40 of 242 · use Search for the rest.

Conditions and decision times are from the borough's own decisions since 2010 (countable planning decisions only; tree works, discharges and amendments excluded) and the decision notices we have read. CIL from the council's charging schedule (verified date shown). s106 and viability figures come only from the documents we hold and have read; ranks compare boroughs on the same basis and are labelled with how many deeds sit behind them. Data built 2026-08-18.